File #: 23-26    Version: Name:
Type: Ordinance / Regular Agenda Status: Passed
File created: 10/13/2022 In control: City Commission
On agenda: 1/24/2023 Final action: 1/24/2023
Title: P.H. 2023-31: (PUBLIC HEARING 2ND READING) AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE A GUARANTEED MAXIMUM PRICE AMENDMENT TO THE CONSTRUCTION MANAGER-AT-RISK CONTRACT BETWEEN THE CITY OF POMPANO BEACH AND DIPOMPEO CONSTRUCTION CORPORATION FOR THE CONSTRUCTION OF THE ULTIMATE SPORTS PARK IMPROVEMENTS; PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE. (Fiscal Impact: $6,166,555.84) FIRST READING: JANUARY 10, 2023
Attachments: 1. Ordinance.pdf, 2. City Attorney Memo 2023-08.pdf, 3. 1731 GMP Amendment Ultimate Sports Park.pdf, 4. Memo to City Attorney - Ultimate Sports CMAR 092822.pdf, 5. Exhibit E Construction Schedule.pdf, 6. Ultimate Park Location Map.pdf

title

P.H. 2023-31: (PUBLIC HEARING 2ND READING)

AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE A GUARANTEED MAXIMUM PRICE AMENDMENT TO THE CONSTRUCTION MANAGER-AT-RISK CONTRACT BETWEEN THE CITY OF POMPANO BEACH AND DIPOMPEO CONSTRUCTION CORPORATION FOR THE CONSTRUCTION OF THE ULTIMATE SPORTS PARK IMPROVEMENTS; PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE.

(Fiscal Impact: $6,166,555.84)

 

FIRST READING: JANUARY 10, 2023

 

staffcontact

(Staff Contact: Fernand Thony/Horacio Danovich)

 

summary

Summary Explanation/Background:

Staff is seeking City Commission approval of an Ordinance to execute a contract amendment with DiPompeo Construction Corporation (DCC) in the sum of $6,166,555.84 (see document entitled 1731 GMP Amendment Ultimate Sports Park). The contract amendment will authorize DCC to carry out construction efforts related to the Ultimate Sports Park located at 212 NW 16th Street next to the Boys and Girls Club and the Broward County Northwest Branch Library (see Location Map). The Ordinance is necessary to retain DCC to provide Construction Management at Risk Services for the GO Bond Ultimate Sports Park project (see Location Map) and award a contract. On September 24. 2019, via Ordinance 2019-98, the City executed a Construction Management at Risk (CMAR) contract with the firm. The City Commission authorized staff to proceed to negotiate a Guaranteed Maximum Price (GMP) contract. The firm prepared a new GMP proposal (see Exhibit “C”) and a Project Schedule (Exhibit "E). The City's Contract Manager prepared the final document and compiled the Exhibits. Under the contract, DCC will be responsible to provide Construction Management at Risk (CMAR) services and oversee efforts to improve the park including, but not limited to, construction of a new rectangular artificial turf field with supporting sports lighting equipment; drainage facilities; bleachers; new bathrooms/changing area; landscape; sidewalks; security system, etc. (see backup pages 23-32 for more details, specific line items and schedule). The project is expected to be completed by mid-October 2023. Staff worked with the CMAR and design team extensively to value engineer the project, reduce costs without reducing quality, and to meet the objectives. During the review, staff met with Walters Zackria (architect) and evaluated design options, opportunities for savings (value engineering), simple plan changes without sacrificing the project’s objective, and more. Some of the items that were thoroughly evaluated included the roof over the new bathroom, bleacher system, and drainage, to name a few.  Subsequently, staff met with the CMAR to confirm their ability to meet the City’s goals in terms of quality, product selection, etc. The result of that pre-work and analysis is reflected in the final GMP. Furthermore, the design team assisted staff with review of the proposed Guaranteed Maximum Price (GMP) (line item by line item) to ensure completeness and accuracy. And, the City’s Contract Manager and City Attorney’s Office assisted with review of the proposal as well as preparation of the contract documents and Ordinance. Staff recommends approval.

 

Origin of request for this action: GO Bond

Fiscal impact and source of funding: $6,166,555.84 - Project No. 19370 (Ultimate Sports Park) - Account No. 323-7648-572.65-12 ($3,744,197) and 319-7648-572.65-12 ($890,297); General Fund Balance ($1,532,062).

 