A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE A PROJECT AGREEMENT BETWEEN THE CITY OF POMPANO BEACH AND THE FLORIDA INLAND NAVIGATION DISTRICT, ACCEPTING A GRANT NOT TO EXCEED $475,000 FOR THE ALSDORF PARK DOCK AND SEAWALL REPLACEMENT, AND CONFIRMING THE CITY’S CONTRIBUTION IN AN AMOUNT OF $475,000; PROVIDING AN EFFECTIVE DATE.
(Fiscal Impact: $475,000.00)
staffcontact
(Staff Contact: Tammy Good/Anthony Alhashemi)
summary
Summary Explanation/Background:
The Alsdorf Park seawall was originally built in the late 1970’s and has gone through numerous repairs throughout its life-cycle. In 2018, a conditional assessment was conducted on the dock and seawall at Alsdorf Park Boat Ramp, located at 2850 NE 14th Street Causeway. The conditional assessment indicated the dock and seawall have reached its useful life and needs immediate repair/replacement. Subsequent to this study, minor repairs have made to eliminate risk of point failures at various locations. Based on the findings of the assessment and the popularity and use of this facility, the recommendation is to remove and replace the dilapidated portion of dock and seawall lying east of the eastern most boat ramp on the Caliban Canal and west of the Intracoastal waterway.
This project meets all the prerequisites to qualify for the 2020-2021 Florida Inland Navigation District (FIND) matching grant. The City has applied for and was a awarded a maximum matching grant amount of $475,000.00 to supplement the construction costs, which are estimated at $950,000.00.
Origin of request for this action: Engineering
Fiscal impact and source of funding: $950,000 from amounts previously budgeted in account 302-7324-530.65-12. Florida Inland Navigation District Waterway Assistance Program matching grant will reimburse the City up to $475,000 (50%) of the costs.