File #: LN-625    Version: Name:
Type: DRC Submission Status: Regular Agenda Ready
File created: 6/20/2024 In control: Development Review Committee
On agenda: 12/4/2024 Final action:
Title: LAKES AT PALM AIRE
Attachments: 1. DRC Drawings_07-03-2024.zip, 2. DRC Documents_07-03-2024.zip, 3. DRC Documents_12.04.2024.zip, 4. DRC Drawings_12.04.2024.zip
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

boardname

DEVELOPMENT REVIEW COMMITTEE

Meeting Date: DECEMBER 4, 2024

 

title

LAKES AT PALM AIRE

 

projectinfo

Request:                     Major Site Plan

P&Z#                     24-12000001

Owner:                     LENR Development LLC

Project Location:                     N Course Dr

Folio Number:                     494204000062

Land Use Designation:                     LM (Low-Medium 5-10 DU/AC)

Zoning District:                     RM-45 (Multiple Family Residence 45)

Commission District:                     5 (Darlene Smith)

Agent:                      Ken DeLaTorre (ken@designandentitlement.com / 561-707-3410)

Project Planner:                     Saul Umana (saul.umana@copbfl.com / 954-786-4662)

 

otherinfo

 

 

Summary:                     

 

The application seeks approval for a Major Site Plan for a 20.64-acre parcel on the south side of West Atlantic Avenue. Additionally, a supporting Rezoning Application has been submitted to request a rezoning from the PR - Parks and Recreation Zoning District to the RM-12 - Multiple Family Residential District. These applications supplement a Land Use Plan Amendment, proposing to change the City's land use designation of the subject property from OR - Recreation and Open Space within the Palm Aire Dashed Line Area (10,631 D.U.) to LM - Low Medium Residential (0 - 10 D.U./Ac.).

The new residential community will consist of fee-simple residential townhomes, with a total of 189 units available. There will be two models of townhomes: one 20 feet wide and the other 24 feet wide, each featuring individual driveways, garage parking, and associated landscaping. This application also includes the drainage of the existing lake on the site and proposes the creation of a new lake and the expansion of an existing lake onto the property. Access to the property will be from a new driveway entrance from Atlantic bypassing through the Canal waterway.

 

 

Staff Conditions:                      

ENGINEERING

Reviewer: David.Mcgirr@copbfl.com <mailto:David.Mcgirr@copbfl.com>

Status: Authorized with Conditions

 

11-7-24

The following comments must be addressed prior to the submission of these plans to the Building Division for formal plan review and permitting:


1. Submit/ upload the (BCEPMGD) Broward County Environmental Protection and Growth Management Division Surface Water Management permit or exemption.
2. Submit / upload a copy of the (FDOT) Florida Department of Transportation driveway connection permit or exemption for the proposed driveway, roadway curb and gutter and sidewalk to be constructed within the road right-of-way of W. Atl. Blvd.
3. Submit / upload a South Florida Water Management Div. right-of-way permit or exemption for the proposed construction within there right-of-way.
4. Submit / upload a copy of the (FDEP) Florida Department of Environmental Protection permit or written exemption from this agency for the proposed potable water main and Raw watermain connections shown on the civil engineering drawing.
5. Submit / upload a copy the (BCEPGMD) Broward County Environmental Protection and Growth Management Division wastewater collection system license/permit or written exemption from this agency for the proposed construction of the gravity wastewater collection systems and sewer force mains shown on the civil engineering plans.
6. Submit / upload a copy the (FDEP) Florida Department of Environmental Protection permit or written exemption from this agency for the proposed construction of the gravity wastewater collection systems and sewer force main shown on the civil engineering plans.
7. Prior to the approval of the City Engineering division, the City’s Utilities Division must approve these plans.
8. Prior to the approval of the City Engineering division, the City’s Planning and Zoning Division must approve these plans.
9. Upload the 2022 City Engineering standard details for the proposed off-site water and sewer connections. These detail drawing may be obtained in pdf format from the City''s website www.pompanobeachfl.gov under departments /engineering.
10. Submit / upload the (FDEP) Florida Department of Environmental Protection NPDES General Permit for the proposed storm water discharge from the proposed site construction activities.
11. Submit / upload the (FDEP) Florida Department of Environmental Protection (NOI) Notice of Intent for the proposed storm water discharge from the proposed site construction activities.

 

UTILTIES

Plan Reviewer: Nathaniel Watson | Nathaniel.watson@copbfl.com

Status: Pending Resubmittal

1.                     Additional comments may be forthcoming contingent upon future submittals to the PAM and/or DRC review process.

2.                     (4.) As discussed, upon executing the access and maintenance agreement, language indemnifying the City for any staining residential from well site maintenance activities.

3.                      (6.) As discussed, DEC will review the location just south of lot 135 in the open space tract area and revise accordingly. Clarification from Schnars on the slope of the area behind THs where the proposed new 20” WM is located.

4.                     (8.) As discussed, Pulte provides a mutually agreed upon electrical contractor once selected.

5.                     (9.) As discussed, Pulte will add 2x-6 conduits for future generator site power service. For protection, Pulte will place the conduits within a concrete duct bank.

6.                     (10.) During the July 22, 2024, meeting concerning the well field impact, it was understood that the City’s consulting for the well sitting and the electrical components would be contacted. The consultants have heard nothing from Pulte’s team to date.

7.                     (11). As a result of comment #10, the preliminary drawings regarding the construction around the City's future well sites and related infrastructure were shared with the city's consultant.
a. The Citys consultant advised the city to upgrade the raw water main from 20 to 24.

b. The Citys consultant advised the City and provided the developer red line marked drawings noting the following:
1. A 100-foot radius setback from the raw water well 28 to the edge of a generator / electrical building. Any diesel or oil leak from the engine generator could potentially contaminate the raw water well.
2. 150 KVA Pad-mounted Outdoor Transformers contain insulating fluid and must be away from the well.
3. According to FDEP and Broward County Protective Zone 1 for Wellfield, the Diesel Fuel Storage Tank shall be at least 100 feet away from the well or perhaps at a further setback.
4. Access Driveway for large maintenance trucks between the well and the generator building and a second driveway for the diesel fuel tank and transformers.

8.                     (5). The electrical wiring for the Citys infrastructure should be separated from the residential electrical duct bank wiring and placed within the 30 easement parallel to the raw water main. Large in-ground electrical pull vaults are required for the industrial installation and are not typically placed within common walkways. Please see the shop drawing for a typical electrical vault in the staff upload documents folder.

9.                     (6.) New 150KVA pad-mounted transformers will be required at each well.

10.                     (12.) The preliminary engineering drawings must be redesigned to accommodate the concerns the City’s consultants raised. Please see the City’s consultant preliminary review in the staff upload documents folder.

Urban Forestry

Plan Reviewer: Wade Collum | wade.collum@copbfl.com <mailto:wade.collum@copbfl.com>

Pending Resubmittal:

1. No comment response sheet was found by Urban Forestry staff to perform a secondary review as some major comments do not appear to have been addressed.
2. Pigeon Plums, Silver Buttonwood and Dahoon Holly’s, and dappling of large canopy trees Live Oak and gumbo limbo are not an adequate species submittal. All trees are to large canopy unless OHW’s exist. The conversation was that if an adequate street tree plan was offered per the code requirements and discussions. Smaller canopy trees; medium first and understory as a last resort would be entertained. This submittal does on reflect either concern, as per previous coments #’d 4, 5, &6.
3. Below are previous comments.
4. Revise easement plan to accommodate code requirements.
5. Staff feels that the easement plan exceeds approvable parameters. The purple easement shadowing should not exceed the width of the drive aisle and is wider than the drive aisle. Staff recommends combining the yellow easement to be beneath the purple allowing for the required street trees to be shown and approved in those locations. Plans as proposed are not approvable for site trees and street tree layouts.
6. All trees are to be large canopy unless over head wires are present, occasional medium canopy trees may be suitable.
7. Propose alternate tree species for Dahoons and Orange Geigers.
8. Shift islands trees at clubhouse to the end of the islands more towards the street and parking rows
9. Provide tree layouts on the overall sheets for the site and the street trees.
10. Provide an Engineering report for prosed lake locations as it relates to distance from existing condo buildings.
11. Provide evidence and note on plans and in narrative that all overhead utilities will be buried for this project as per 155.5509.
12. Submit a Tree Appraisal prepared by an ISA Certified Arborist in accordance with Rule 14-40.030 of the Florida Administrative Code as amended, for all trees and palms that are specimen size , and DBH for caliper for all nonspecimen trees, that assigns each existing tree a number; that specifies the common and botanical name for each existing tree; describes the overall size and caliper of each existing tree; evaluates the health condition of each existing tree; identifies the status of each existing tree (whether the tree is to be protected in place, be relocated, or be removed); and provides a dollar value for each existing tree included on the tree survey in accordance with Code Section 155.2411, and Part 5. Palm tree values will be based on the Cost Replacement method. Include all Ficus microcarpa’s on site.
13. Provide methodology for tree values as some numbers appear low.
14. Provide the dollar value for specimen trees, height on palms, and DBH of all non specimen trees removed vs. the dollar value, palm height, and caliper of trees replaced. Provide this in table form separating specimen dollar values 18” > and combined DBH inches for tree <18.
15. As per 155.5204.E.1.b.i-iv; Mitigation is to be replacement trees above and beyond required plantings. Provide this in table form separating specimen dollar values 18” > and combined DBH inches for tree <18.
16. Provide approvals from Broward County Surface Water Management for filling in the pond / retention area.
17. Provie approvals from SFWMD for vehicular cross access as proposed on the north side.
18. Provide a data table showing how the site is meeting the requirements of 155.5203. C Minimum Site Development Landscaping. Square footage referenced is not accurate. Requirements are based on the Total Site Area square footage of the site to match information on the site plan. Tree count information totals are incorrect and do not match plant list. Provide an all inclusive plant list for the purposes of review.
19. This is a PR Zoning District and is required to have 2 trees per 2000 sq. ft which is approximately 600 trees. Show this is in the data table. Street trees cannot be used toward this calculation.
20. As per 155.5203.B.2.ii.Based on the height of the building half of all required canopy trees are to be 16’ tall and palms to be 22’ OA, please adjust.
21. Show how requirements from 155.5203.D.5 VUA Landscaping are being met. Provide a minimum of 13’ of landscape areas between a vehicular use area and an abutting building for all buildings proposed.
22. As per 155.5203.D.5 VUA in part, the Development Services Director may grant modifications to the required landscaping between vehicular use areas and buildings for development that provide at least 50% of the required width, subject to providing superior landscape design that includes a minimum of trees or palms as follows within the subject area and must include one or more of the following elements: Clarify if interior roadways are going to be streets or internal drives
i. Palms must be provided in multiples (doubles or triples);
ii. If palms and trees are combined, one row of shrubs can be provided;
iii. If palms or trees are provided, shrubs must be included in layering or height tiering with a minimum of 2 layers or tiers;
iv. If trees are provided, design must include a minimum of 2 species;
v. Trees or palms must be a minimum of 14 feet in height;
vi. Layered or height tiered shrubs are provided in variety with a minimum of two (2) species;
vii. Suspended pavements systems are provided for the adjacent vehicular use area.
23. Show how requirements as per 155.5203.E., Building Base Plantings are being met.
24. Provide landscape typical sheets with landscaping shown on them.
25. Provide an overall landscape plan with landscaping minimally reflecting street trees, site trees, and perimeter trees.
26. No exterior lighting fixtures shall be located in any landscaped planting areas required in and around vehicular uses areas in accordance with Section 155.5401.C, Vehicular Use Area Landscaping (e.g., perimeter landscaping strips, landscaped islands in parking bays, landscaped areas between parking bays, and landscaping between vehicular use areas and buildings). Conflicts with entrance islands.
27. Show light poles with radii on the landscape sheets.
28. As per 155.5102.C.9; provide continuous curbing around all VUA area to prohibit vehicular encroachment into required landscaping.
29. Provide VUA requirements as per 155.5203.D along both sides of all ingress egress areas, not shown.
30. Provide Street Trees at 1:40’ as per 155.5203.G.2.c.in all other areas on both sides of the roadways. All street trees are to be large canopy trees. Show trees on the overall street tree plan.
31. Provide a street tree plan on a separate Street Tree sheet. All street trees are to be large canopy trees.
32. Provide Root Barrier specifications on the plan. Staff strongly recommends a hard physical root barrier, such as Deep Root hard plastic at least 24” in depth in all area bordering hardscapes or utilities.
33. Bubblers will be provided for all new and relocated trees and palms.
34. Rework Phase Plan to include perimeter plantings, street trees, entrance, mail kiosks, amenities etc. to be included in Phase I by the first CO
35. There are large existing trees on site that could be retained, relocated and preserved. Please adjust to accommodate.
36. As per 155.5203.D.4: Landscaping of vehicular use area interior d. Landscaped Driveway Medians. Driveways within vehicular use areas may include a center landscaped median provided the median: i. Is at least eight feet wide; ii. Is maintained in grass, groundcover, shrubs, ornamental trees, or understory trees; and iii. Is protected from vehicular encroachment by curbing. Tree shall be included, medium canopy Flowering trees such as Yellow or Pink tabs would be a welcomed addition
37. Provide civil sheets.
38. Show locations of all proposed FDC’s, including but not limited to fire hydrants
39. Provide a pervious area sheet with pervious calculations.
40. Provide a proper plant list to include trees and palms. Remove gallon sizes from shrubs and groundcovers. Clarify an overall plant list as the rappers to be different versions and we want to be sure we are looking at the same ones.
41. Provide new soil specifications in percentage form.
42. Sheet LSP-2, populate southern buffer with trees at south edge of property. Perimeter trees stop at lake just west of pool area.
43. LSP-1 shows proposed lake that does not directly abut existing lake to the south as referred in the note which is +/- 50’ from existing multi family building to the south. Confirm this is correct and the approach is structurally sound. Show adjoining parcel building lines greyed out on the plan for reference and correct.
44. Provide and Environmental Assessment and Wildlife Survey for the property to include Gopher Tortoises, Burrowing Owls, and protected plant and animal life.
45. All tree work will require permitting by a registered Broward County Tree Trimmer.
46. Provide a comment response sheet as to specifically how comments have been addressed at time of resubmittal.
47. Additional comments may be rendered a time of resubmittal.

FIRE

Plan Reviewer: Jim Galloway \ jim.galloway@copbfl.com <mailto:jim.galloway@copbfl.com>

Status: Authorized

This P&Z application is able to meet all of the Fire Department requirements at this time for Site Plan Review. However, the petitioner shall maintain all proper fire department access and water supply requirements as per chapter 18 of NFPA 1 as amended from time to time.
*Additional comments may follow throughout the remainder of the permitting process. The buildings shall be in compliance with All NFPA Standards prior to receiving Fire Department approval.

PLANNING

Plan Reviewer: Max Wemyss | max.wemyss@copbfl.com <mailto:max.wemyss@copbfl.com>

Status: Authorized with Conditions

Project requires LUPA and Rezoning prior to evaluation of Site Plan.
Condition of Building Permit Only: Provide confirmation of the absence of environmentally sensitive species / protected species on the subject property. Any removal of animals per according to report will require permitting.
Provide approval for modification to the lakes and surface water/drainage.
Easement Plan conflicts with required site features (as identified in the Zoning/Landscaping review) - identify a compromise or obtain relief in the form of a variance.
LUPA may trigger affordable housing (or fee) requirements.

 

BSO

Plan Reviewer:

Status: Authorized

Development Review Committee Date Reviewed: 11-07-2024
Subject: CPTED and Security Strengthening Report: PZ#: 24-12000001
Name: Lakes at Palm Aire Site Plan
Address / Folio: N Course Drive, Pompano Beach, FL
Type: Major Site Plan

Reviewer: BSO Deputy T. Russo for the City of Pompano Beach
Reviewer: BSO Deputy P. Noble for the City of Pompano Beach
anthony_russo@sheriff.org
M-(561) 917-4556 (Send Text & Email; No Voicemail)
Tuesday - Friday; 8 AM - 3 PM
patrick_noble@sheriff.org
M-(954) 709-7006 (Send Text & Email; No Voicemail)
Monday - Thursday; 8 AM - 3 PM

***CONFIDENTAILITY STATEMENT***
PLEASE STAMP YOUR CPTED NARRATIVE & DIAGRAM "CONFIDENTIAL"
Information contained in CPTED & Security Strengthening Narrative Documents & Diagram Drawings are considered Confidential Pursuant to Florida State Statutes 119.071 (3); 119.15 (6b1); 281.301 & 286.011. Dissemination of security plans should be limited to authorized personnel only. All CPTED & Security Strengthening Plans submitted to the City of Pompano Beach must be stamped “CONFIDENTIAL” to ensure restricted access.


A. *** CPTED / SECURITY CONSULTANT ***
The services of an independent, & highly experienced, qualified, & certified Security Crime Prevention/ CPTED Consultant are highly recommended to achieve & maintain objective credible security review integrity, & to expedite processing.

B. *** DISCLAIMER ***
SAFETY & SECURITY REVIEWS do not guarantee a crime will never occur; it is an effort to mitigate opportunities for crime & to help avoid any present & future security deficiencies, conflicts, threats, breaches, or liabilities that might occur without any review.

C. ***PLEASE NOTE***
When a Broward Sheriff’s Office CPTED Practitioner is required to assist in an inspection of the project during the Certificate of Completion &/or Certificate of Occupancy Application Phase, Security Strengthening & CPTED measures that have not been adequately addressed will still be required to ensure the safety & well-being of the employees, residents, tenants, visitors & all legitimate users of the site.

D. ***BROWARD SHERIFF’S OFFICE NO TRESPASSING PROGRAM***
Please note that participation in the BSO No Trespassing Program is required. If this site is already on the program, then additional signage may be necessary along with an updated affidavit signed by authorized personnel. Please contact the BSO Pompano Beach C.P.T.E.D Advisor regarding placement of the No Trespass Signs.

ZONING

Plan Reviewer: Saul Umana | saul.umana@copbfl.com <mailto:saul.umana@copbfl.com>

Status: Pending Resubmittal (because other departments need to approve first)

 

1)                     Please note that all comments are subject to change until LUPA and rezoning are completed.

 

2)                     The following comment will be removed until Landscaping plan is approval as easement locations can interfere with easements. Comment does not need to be addressed with Zoning Staff and will be satisfied upon satisfaction of other departments. Staff feels that the easement plan exceeds approvable parameters. The purple easement shadowing should not exceed the width of the drive aisle and is currently wider than the drive aisle. Staff recommends combining the yellow easement with the purple, allowing for the required street trees to be shown and approved in those locations. Plans as proposed are not approvable for site trees and street tree layouts. Subject to approval/review by the utilities department.

 

The following comments are advised to be answer/ expected to be brought up during site plan approval hearing. Prepare answers for the following: (not a condition to be answered at DRC level for zoning authorization)

 

3)                     Comment to be addressed at the time of Planning and Zoning Board Submittal:  Submit Evidence to the board that the lake expansion of the city’s lake will not have impacts to the existing condos. Also, submit evidence that Engineering and Utilities have given final approval of drainage/lake expansion.

 

4)                     Comment to be addressed at time of Planning and Zoning Board submittal: Provide to the board more concrete plan of how the lake expansion will be managed in the future: (Previous comment: If the lake expansion is approved, have there been discussions on how this will be managed, such as through an easement, new property lines, or abandonment?)

 

 

5)                     Comment to be addressed at the time of Planning and Zoning Board submittal: Provide to the board the evidence/reasoning behind the lake expansion. (Previous comment): What is the reasoning behind the lake expansion? Has the team explored placing the townhomes near the waterway within their own property lines?

 

6)                     Thank you for creating the patio options - in the future, homeowners will be subjected to these patio options.

.

7)                     Condition of the Building Permit: Obtain all necessary approvals for the bridge/canal entrance. In addition, the inclusion of the temporary sales center is best suited as part of a Temporary Use Permit process which will require separate approvals as per noted on the plans.

 

8)                     On the typical detail sheet, indicate the guest parking. If not using the driveway and garage for each townhome to have their own guest space, then an off-site parking lot for guest parking must be provided. Comment not addressed: Demonstrate that 20’ townhomes can accommodate 3 parking spaces ( 2 for the dwelling and one for guest). Otherwise, off site guest parking is required.

9)                     As part of the Planning and Zoning Board Submittal: Provide evidence/ narrative provide evidence prior to building permit approval of how sustainability will be achieved.  Multifamily residential development shall achieve at least ten points.

10)                     Prior to AAC submittal, provide color elevations of the Recreation area with color and material callouts.

11)                     As part of the AAC submittal, explain via narrative and to the board how architectural variability is being achived through the use of two or more of the following features:

 4.   Architectural Variability

   Repetitive "look-alike" multi-building developments shall be prohibited. Multi-building developments subject to these standards shall ensure that each structure is distinguished from others through the use of two or more of the following features:

         a.   A variation in structure length of 30 percent or more;

         b.   A variation in the structure footprint size of 30 percent or more;

        c.   A distinct variation in color and use of materials;

         d.   A variation in the type of dwelling unit contained in the structure that results in a significantly different scale and mass (e.g., garden apartments vs. townhomes);

         e.   A variation in structure height by at least ten percent; or

         f.   A variation in roof form.

 

12)                     This comment is remaining until Approval of easements from Utilities is finalized: Unit 48, Unit 72, Unit 14, and Unit 186 future lot lines will fall under the easements for wells. Encroachment to be approved by Utilities/ and part of the recordation process.

13)                     Various site plans, such as FSP.4, mention the a 6’ Pre-Cast wall typical. Will there be a perimeter pre cast wall? Provide details of the pre-cast wall for the AAC submittal

14)                     Garbage collection - has the applicant reach out regarding how garbage will be collected? Where it will stored while not out for collection?

15)                     Condition of Building permit approval: Show evidence of 10 DE abandonment as called out on FS4.4

16)                     There is a duplicate 012 FSP-4 - Remove the incorrect file

17)                     Sheet FSP.11 Shows Unit 99 as 25’ setback from rear property line but the measuring point does not appear to be from the rear. Please verify/clarify.

18)                     Sheet FSP.3 -number all on street guest parking and provide dimension of the parallel parking space.

19)                     As part of the AAC submittal, provide elvation, material callouts for the monument sign.

20)                     Throughout site label the overall property boundaries as PL

 

 

 

BUILDING

Plan Reviewer: Todd Stricker | todd.stricker@copbfl.com <mailto:todd.stricker@copbfl.com>

Status: Authorized with Conditions

 

BLDG 11-7-2024
Advisory Comments
A preliminary examination of the documents has been performed; additional comments may apply when completed plans and/or specifications have been submitted for permitting to the building department.
Buildings shall comply with all local, state and federal codes in effect at time of application, including FEMA Floodplain, NPDES and HVHZ regulations.

FBC_BCA 105.2.3 Public service agencies/other approvals. The building official shall require that the laws, rules and regulations of any other regulatory AHJ, and where such laws, rules and regulations are applicable and are known to the building official, shall be satisfied before a permit shall be issued. The building official shall require such evidence, as in his or her opinion is reasonable, to show such other approvals.

City Ordinance 53.16(A)(1) Construction sites and construction activities. construction sites and operations shall be required to maintain during and after all construction, development excavation or alteration operations, structural and non-structural best management practices with the intent to reduce pollutants and sediment in stormwater runoff.

City Ordinance 152.06(A): If applicable, contractor shall provide temporary screened fence complying with City Ordinance 152.06(B) through 152.06(G).

FBC 3306.1 Pedestrians shall be protected during construction, remodeling and demolition activities as required by this Chapter and Table 3306.1. Signs shall be provided to direct pedestrian traffic.

City Ordinance 152.25(A) Site plans and construction documents, Information for development in areas with base flood elevations. The site plan or construction documents for any development subject to the requirements of the floodplain regulations shall be drawn to scale and shall include, as applicable to the proposed development all sections from: City Ordinance 152.25 (A)(1) thru City Ordinance 152.25 (A)(7). Delineation of flood hazard areas, floodway boundaries and flood zone(s), base flood elevation(s), and ground elevations if necessary for review of the proposed development, etc. residential buildings shall comply with City Ordinance 152.29(C)(1)(A).

FHA Title VIII of the Civil Rights Act of 1968, commonly known as the Fair Housing Act, prohibits discrimination in the sale, rental, and financing of dwellings based on race, color, religion, sex, and national origin. In 1988, Congress passed the Fair Housing Amendments Act. The Amendments expand coverage of Title VIII to prohibit discriminatory housing practices based on disability and familial status. Now it is unlawful to deny the rental or sale of a dwelling unit to a person because that person has a disability.

FBC A201.1 This code establishes standards for accessibility to places of public accommodation and commercial facilities by individuals with disabilities. All new or altered public buildings and facilities, private buildings and facilities, places of public accommodation and commercial facilities subject to this code shall comply with 2020 FBC Accessibility.

FBC A221.1.1 Florida vertical accessibility. Nothing in this code relieves the owner of any building, structure, or facility governed by this code from the duty to provide vertical accessibility to all levels above and below the occupiable grade level, regardless of whether the ADA standards for accessible design require an elevator to be installed in such building, structure or facility.

FBC A206.2.1 Site arrival points. At least one accessible route shall be provided within the site from accessible parking spaces complying with FBC A502 and accessible passenger loading zones complying with FBC A209; public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve.

FBC_BCA 107.3.4.0.6 Compliance with the specific minimum requirements of this code shall not be in itself deemed sufficient to assure that a building or structure complies with all of the requirements of this code. it is the responsibility of the architect and/or engineer of record for the building, structure or facility to determine through rational analysis what design requirements are necessary to comply with 2020 FBC.

1. FBC_BCA 107.1 As per the building official, separate building applications will be required for erosion control, site work, temporary fences, monumental signage and miscellaneous site structures.

2. FBC [F] 903.2 The enforcing agency will require that all provisions for an approved automatic sprinkler systems in new buildings and structures be provided in the locations described in sections 903.2.1 through 903.2.12 if applicable.

3. FBC 701.1 The enforcing agency will require that the provisions of this chapter, governing the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated construction separation of adjacent spaces to safeguard against the spread of fire and smoke within a building and the spread of fire to or from buildings, comply with this section of the code.

4. FBC 703.2 Fire-resistance ratings. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire-resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating.

5. FBC 1003.1 The enforcing agency will require that all general requirements specified in sections 1003 through 1013, applicable to all three elements of the means of egress system, in addition to those specific requirements for the exit access, the exit and the exit discharge, comply with this section of the code.

6. FBC 1029.1 In addition to the means of egress required by this chapter, provisions shall be made for emergency escape and rescue openings in Group R-2 Occupancies in accordance with Tables 1021.2(1) and 1021.2(2) and Group R-3 Occupancies. Basements and sleeping rooms below the fourth story above grade plane shall have at least one exterior emergency escape and rescue opening in accordance with this section.

7. FBC_BCA 107.1.1 The enforcing agency will require a life safety plan illustrating the floor area with proposed alterations with each room labeled. indicate construction type, fire rated walls, occupancy type: (current and proposed), occupancy load, means of egress, common path/travel distance/dead end corridor limits, accessibility accommodations including areas of refuge if applicable, emergency lighting, exits/exit signage, fire extinguishers, smoke alarms, fire suppression system and pull stations if applicable. Also provide tested design from accepted agency for rated walls and penetration details.

8. FBC_BCA 107.3.5.6 The enforcing agency will require product approvals be reviewed and approved by the building designer prior to submittal to verify that such products comply with the design specifications. Reviewed and approved product approvals shall then become part of the plans and/or specifications. Product approval shall be filed with the building official for review and approval prior to installation.

9. FBC_BCA 107.3.5.2 The enforcing agency will require that all shop drawings, (i.e. components attached to building structure, trusses/joists, window walls, railings, awnings, chutes…etc), necessary to show compliance with applicable codes; shall be approved by the architect or professional engineer and submitted to the building official prior to installation.

10. F.S. 481.221(2) The enforcing agency will require digital signature panel to be active on all documents submitted for review to authenticate the serial number matches the submitted ESA. F.A.C. 61g1-16.005 Each sheet is required to be digitally or electronically signed, and bear the impress seal of, an architect or engineer (FBC_BCA 107.3.4.0.1).

11. FBC_BCA 107.3.4.0.8 All plans and/or specifications prepared by an architect or an engineer pursuant to the requirements of this code shall be hand signed, dated and sealed.

12. FBC_BCA 110.10.1 The enforcing agency will require a special inspector for various components of the building as determined by the building official. Building dept. will require special inspector form be completed and submitted for approval.

13. FBC_BCA 110.7 For threshold buildings, shoring and associated formwork or false work shall be designed and inspected by an engineer, employed by the permit holder or subcontractor, prior to any required mandatory inspections by the threshold building inspector.

14. FBC_BCA 110.8.1 The enforcing agency shall require a special inspector to perform structural inspections on a threshold building pursuant to a structural inspection plan prepared by the engineer or architect of record. The structural inspection plan must be submitted to the enforcing agency prior to the issuance of a building permit for the construction of a threshold building.

15. FBC 1512.3.1 The enforcing agency will require that all new roofing construction, including recovering and reroofing, repair or maintenance shall have A HVHZ uniform roofing permit application, as established by the authority having jurisdiction, completed and executed by a licensed contractor.
Fbc 1512.3.2 The uniform roofing permit shall include calculations in accordance With Chapter 16 (High-Velocity Hurricane Zones) of this code, unless the roofing assembly is less than the height/pressure threshold allowed in the applicable protocols herein.


16. FBC A208.2.3.3 Parking for guests, employees, and other non-residents. Where parking spaces are provided for persons other than residents, parking shall be provided in accordance with table 208.2.

17. FBC A502.6 The enforcing agency will require parking space identification comply with the following code: signs shall include the international symbol of accessibility complying with FBC A703.7.2.1. Signs identifying van parking spaces when required By FBC A502.2 shall contain the designation “Van Accessible.” Reference Engineering Standard 300-5.

18. If Applicable, FBC R802.1.7.1 [IRC R802.10.1] Truss design drawings, prepared in conformance with section R802.1.7.1, shall be provided to the building official and approved prior to installation.

19. FBC 3303.5 Water Accumulation. The enforcing agency will require provisions be made to prevent the accumulation of water or damage to any foundations on the premises or the adjoining property.

20. 1804.4 Site Grading. The ground immediately adjacent to the foundation shall be sloped away from the building at a slope of not less than one unit vertical in 20 units horizontal (5-percent slope) for a minimum distance of 10 feet measured perpendicular to the face of the wall. If physical obstructions or lot lines prohibit 10 feet of horizontal distance, a 5-percent slope shall be provided to an approved alternative method of diverting water away from the foundation. Swales used for this purpose shall be sloped a minimum of 2 percent where located within 10 feet of the building foundation. Impervious surfaces within 10 feet of the building foundation shall be sloped a minimum of 2 percent away from the building.

21. FBC_BCA 110.13.2.1 It shall be the joint responsibility of any owner of real property upon which construction is occurring, and any contractor responsible for said construction, to ensure that all road rights-of-way remain free at all times of all construction waste and trash resulting from such construction, and that all waste and trash resulting from the construction are contained on the real property upon which the construction occurs.

22. FBC_BCA 109.3 Building Permit Valuations. The applicant for a permit shall provide an estimated permit value at a time of application. Permit valuations, shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems.

23. FBC_BCA 110.8.5.4 All plans for the building which are required to be signed and sealed by the architect or engineer of record contain a statement that, to the best of the architect’s or engineer’s knowledge, the plans and specifications comply with the applicable minimum building codes and the applicable fire-safety standards as determined by the local authority in accordance with this section and chapter 633, Florida Statutes.