Title: MODERA
Attachments: 1. 25-12000028 DRC Comments_10.15.25.pdf, 2. 25-12000028 DRC Staff Report_1.7.26.pdf, 3. DRC Documents_10.15.2025.zip, 4. DRC Drawings_10.15.2025.zip, 5. DRC Documents_01.07.2026.zip, 6. DRC Drawings_01.07.2026.zip, 7. DRC Drawings_03.18.2026.zip, 8. DRC Documents_03.18.2026.zip, 9. 25-12000028 DRC Staff Report_3.18.26.pdf, 10. DRC Drawings_06.03.2026.zip, 11. DRC Documents_06.03.2026.zip
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

boardname

DEVELOPMENT REVIEW COMMITTEE

Meeting Date: JUNE 3, 2026

 

title

MODERA

 

projectinfo

Request:                     Major Site Plan

P&Z#                     25-12000028

Owner:                     Pompano Real Estate Investments LLC

Project Location:                     855 S Federal Highway

Folio Number:                     494306490010

Land Use Designation:                     C (Commercial)

Zoning District:                     B-3 (General Business)

Commission District:                     1 (Audrey Fesik)

Agent:                      Christina Bilenki

Project Planner:                     Lauren Gratzer (954-545-7792 / lauren.gratzer@copbfl.com)

 

otherinfo

 

Summary:                     

The applicant is requesting approval of a Major Site Plan application for the construction of an eight (8) story mixed-use building with 347 residential units and 10,400 square feet of commercial space. This project is being submitted concurrently with a Rezoning application to amend the zoning district from B-3 to PD-I in order to establish a Master Plan for the site, as well as a Plat Note Amendment application.

 

Development Review Committee Member

Status as of 5/21/2026

Planning Zoning

Pending Development Order

Zoning

*Resubmittal Required

Urban Forestry

*Resubmittal Required

Fire Prevention

Pending Development Order

Engineering

Pending Development Order

Utilities

Pending Development Order

BSO

Pending Development Order

Building Division

Pending Development Order

 

 

 

 

 

 

 

 

Staff Conditions:                      

PLANNING

Max Wemyss | max.wemyss@copbfl.com

Pending Development Order

 

1.                     Info only: Approach to Entitlements:

Policy 2.16.4 makes residential a permitted use in Commercial land use and does not specify maximum density. It allows 6 bonus units for every moderate-income (80-120% of AMI) affordable unit without limitation on total units.


Policy 2.16.4 does not specify net versus gross acreage, therefore, net acreage is assumed to apply whenever acreage is referenced. The net site acreage proposed for the Modera site is 3.88 acres, therefore, the non-accessory commercial requirement under 2.16.4 is for a site less than 5-acres which is 50% of the ground floor for the portion of the buildings facing Federal Highway.


The Applicant is proposing to rezone the property to PD. Per the Citys land development code, the PD zoning district may use gross acreage to calculate density. The Modera site to the centerline of Federal Highway is 5.04 acres which also includes the area to the centerline of the adjacent Nancy Canal. Section 155.4202 of the Citys Code allows 69 du/ac for properties with commercial land use using Policy 2.16.4 for entitlements. The City Engineer has determined that the Nancy Canal is NOT considered part of the Primary Drainage System and, therefore, can be counted towards density, this results in a density limitation for the PD of 347 units based on the gross acreage. Application proposes 347 units.

2.                     Info only: The property abuts Federal Hwy where 120 foot ROW is required. Based on the survey, the property provides a minimum of 79 feet to the centerline, therefore, no additional ROW is required to be dedicated.

3.                     Application to be consistent with Planned Development, pending approval.

4.                     Plat note amendment in process with County. Recordation required prior to building permit approval.

5.                     A final SCAD Letter will be required prior to Building Permit Issuance.

6.                     In order to obtain the number of units proposed, affordable housing must be a component of the residential development based on the following bonus units to affordable unit formula(s) described below:
(a) Moderate income: six (6) bonus units for every (1) one moderate income unit.
(b) Low income: nine (9) bonus units for every (1) one low income unit.
(c) Very-low income: nineteen (19) bonus units for every (1) one very-low income unit.

Identify the proposed ratio. A declaration will be required. The units reserved as affordable will be required to be distributed, consistent with the proposed unit mix of the development.

7.                     Modify the access easement as necessary for the property to the south remaining after acquisition of the 3.88-acre site. Which sheet shows the easement?  The Shared Access Easement Exhibit (EX-1) was not provided with this submittal.

 

 

ZONING

Lauren Gratzer | lauren.gratzer@copbfl.com

Pending Resubmittal

 

1.                     Info only: Address all comments on the PD Master Plan provided with application number PZ 25-13000002. Upload the PD Master Plan as a separate document as the Site Plan.

a.                     On the master plan, provide a deviation table that identifies how the PD deviates from the standard code requirements.

b.                     Understood. Note that the site plan shall reflect the required setbacks/dimensional standards and the permitted uses established from the PD. If any changes occur to the PD document, the site plan data table shall be updated.

2.                     Condition of approvals:

a.                     The subject parcel shall be formally subdivided with Broward County to reflect the proposed PD. The division shall be configured so that nonconformities are not created or increased on the south parcel and compliance with requirements such as perimeter landscape strips and other spatial items such as setbacks are met. Any construction required for the southern parcel shall obtain separate building permits from the subject parcel.

b.                     A shared access agreement shall be provided for the new north and south parcels at the time of building permit approval.

c.                     The access easement shown on the survey sketch (per plat) shall be revised or abandoned to correlate with the access points of the new southern parcel. The new access easement shall be established prior to building permit approval. 

d.                     The Plat is restricted to 30,000 SF of commercial development. The proposed Plat Note Amendment to include residential shall be approved as a condition of approval for this site plan.

e.                     The standard utility easement form shall be provided at time of building permit for the construction of the sidewalk within this north utility easement.

f.                     The sustainability narrative has been received. The applicant shall provide evidence of compliance for the points used for the Sustainability Narrative as submitted to the DRC by time of building permit approval in accordance with Table 155.5802: Sustainable Development Options and Points.

3.                     A vehicular use area (VUA) buffer is required for the drive aisle along the new south property line in accordance with section 155.5203.D.

a.                     Revise the property line of this new parcel to include the VUA buffer on the interior side of it.

b.                     Please clarify the trees proposed south of the south property line but north of the blue line. These trees are off-site and therefore do not count toward the subject site’s minimums. These trees are included in the tree count for the site, but are off-site. Shift the line and/or clarify, correct, justify, or remove. Alternatively, a shared landscape agreement can be provided to ensure maintenance and responsibility between the subject site ownership and the southern property owner.

4.                     Show the roof structure on the elevation and clarify its height from the roof deck.

a.                     Sheet A105 is the roof plan. The height was not provided here. Additionally, the elevation sheets were not updated to show the shade structure or its height.

b.                     Condition: Acknowledged. Provide the details of the rooftop canopy on all relevant floor plans and cross sections (footings, structure, etc.) by time of building permit. Additionally, provide the canopy product detail at time of permitting.

5.                     In accordance with code section 155.5102.L, all parking areas containing more than ten parking spaces shall provide bicycle racks or lockers sufficient to accommodate the parking of at least four bicycles for each ten parking spaces, or major fraction thereof, above ten spaces-provided that no more than 20 bicycle parking spaces shall be required in any one parking area. Required bike racks/lockers shall be installed on a paved surface and located in visible, well-lit areas conveniently accessible to the primary entrances of a development principal building(s). They shall be located where they do not interfere with pedestrian traffic and are protected from conflicts with vehicular traffic. Clarify how many bikes can be stored in the bike storage room for the residential portion. Provide at least one bike rack outside near the commercial spaces.

a.                     Bike storage/rack counts not provided within the site plan data table.

b.                     The exterior bike racks were removed. Put back bike racks somewhere near the commercial space for public use. Inside the 15’ walkway area seems appropriate. Update the site data table to reflect the quantity of bike racks near the commercial area.

c.                     The site plan data table was not updated to reflect the number of exterior bike spaces.

6.                     On sheet C-800 clarify what area is being counted towards the “Nancy waterway shore”. The chart claims this is 12% of the site's pervious area. Clarify if this shore area is in the water as this cannot count towards the required pervious area. Pervious area shall be dry land area that contains living material (sod, landscaping, etc.) so that water can percolate into the ground.

a.                     As mentioned, the waterway shoreline or bank area cannot be counted towards the pervious area of the site as this area is normally underwater and not made of living material that percolates into the ground. The proposed site only has 17.7% total pervious area rather than the required 20% minimum. Either revise the plans to provide more living landscape area or provide a deviation table in the PD Documents/Master Plan that allows this. Additionally, provide a note on the Site Plan that there shall be no future expansion of the building, pavers, concrete, patios, or other impervious area.

7.                     The Director of Environmental Services, Russell Ketchem, has provided the following comment for the proposed trash pick up/trash location: “The proposed development shall use a dumpster, which requires a front-loading truck. The current proposal will not work as the truck will be forced to back into a parking space, which cannot be done if a car is parked there. The turning radius and back-out points need to be clear from other vehicles and buildings.  I would suggest that the proposer indicate (via CAD) the turning radius on the plan, rather than hand-drawn marks.” Please contact Russell Ketchem directly for future feedback at Russell.Ketchem@copbfl.com <mailto:Russell.Ketchem@copbfl.com>.

a.                     The garbage truck plan still shows the truck backing into the parking space. Revise the plan so the front-loading truck heading into the pickup area and then backing out and circulating the parking lot so that it doesn’t back into a space.

8.                     Clarify if you are adding boat slips to the project. A 2025 environmental memo was added saying the county will allow up to 4 slips but boat slips are not shown on the plans.

9.                     On the site data table, the note for the provided height got cut off. Revise to expand this box on the chart.

10.                     The new survey says the total site square footage is 177,141 SF. The site plan has a typo that says 177,142 SF. Revise.

11.                     Revise the site plan sheet to include the site plan data table on the same sheet. This should not be separated.

12.                     The western landscape buffer along the canal is required to be 10’ abutting the VUA in the southwestern part of the site. The current proposal shows less than 10’ in place of a patio area. Either revise the plans or provide this reduction of a VUA landscape buffer within the deviation table as part of the PD Plan/Master Plan.

 

 

LANDSCAPE REVIEW

Wade Collum | wade.collum@copbfl.com

Pending Resubmittal

 

1.                     As per 155.5401.C. remove light poles from required VUA areas, perimeter landscaping strips, landscaped islands in parking bays, landscaped areas between parking bays, and landscaping between vehicular use areas and buildings. Trees are inside of the 15’ setback radii.

2.                     Please provide in writing that there are no balcony / building eyebrow conflicts with the required VUA or Base plantings.

3.                     Please adjust SE VUA perimeter to remove 1 parking stall to achieve the 10’ landscape buffer at the entrance.

4.                     It still appears that required trees are being slated as mitigation and will require discussion with staff.

5.                     Provide evidence of availability for a large amount of the proposed trees and palms as they are currently unavailable and will not be available any time soon. The unit cost of some of the material seems overinflated and not indicative of the current market value of plant material.

6.                     Please clarify the trees proposed south of the south property line but north of the blue line. These trees are off-site and therefore do not count toward the subject site’s minimums. These trees are included in the tree count for the site, but are off-site. Shift the line and/or clarify, correct, justify, or remove. Alternatively, a shared landscape agreement can be provided to ensure maintenance and responsibility between the subject site ownership and the southern property owner.

7.                     Provide a cross section detail of the proposed building footers / slab as it appears that it will encroach into the required foundation landscaping soil space at the footers of the building. Provide drawings and verification of the use of monolithic / eccentric footings as it relates to these areas. Is this for all areas of the site adjoining landscaping? Provide the sheet name and details. Provide specifications and measurements on the detail please.

8.                     Provide the 10’ required landscape buffer along the West perimeter is being satisfied on the property. That’s to be a clear 10’ pervious buffer with only trees, shrubs, and sod. Staff could not locate red dashed line and the buffer currently measures at +/- 6’ in this area.

9.                     Relocate utilities out of required landscape areas, SW parking islands. SS on west two islands, and fire line north end of retail parking row.

10.                     Adjust planting details to only show sisal or other biodegradable material attached to trunk of tree. Remove any reference to wire.

11.                     Provide a cross-section detail of the area of the proposed retaining wall, mangroves, and mangrove trees directly adjacent to the proposed wall. How will this be managed? Thank you. Please provide the dimensions of the wall setback proposed adjacent to the Mangroves on the detail.

12.                     Please provide a detailed narrative on how the west shoreline is going to be impacted by the new sea wall, the potential change in grade and the impact to the critical root zones of nearby existing trees proposed to remain and be protected, and an action plan for preservation. Staff could not locate narrative “by civil”. Staff could not locate NARRATIVE. Please provide a specific sheet or document.

13.                     Provide details as to how the landscaping along the waterway on the west perimeter will be maintained as to continue to provide a community benefit to the single-family homes across the canal. Staff could not locate narrative.

14.                     On this master landscape plan, provide a note stating that the landscape provided along the west waterway, including the Mangrove’s and any Mangrove replacements, will be maintained in perpetuity. Staff could not locate narrative.

15.                     Please provide a detailed comment response sheet as to specifically how comments have been addressed at time of resubmittal.

16.                     Additional comments may be rendered a time of resubmittal.

 

 

FIRE DEPARTMENT

Jim Galloway | jim.galloway@copbfl.com

Pending Development Order

 

This P&Z application is able to meet all of the Fire Department requirements at this time for Site Plan Review. However, the petitioner shall maintain all proper fire department access and water supply requirements as per chapter 18 of NFPA 1 as amended from time to time.

*Additional comments may follow throughout the remainder of the permitting process. The buildings shall be in compliance with All NFPA Standards prior to receiving Fire Department approval.

 

 

 

 

ENGINEERING DEPARTMENT

David McGirr | david.mcgirr@copbfl.com

Pending Development Order


The following comments must be addressed prior to the submission of these plans to the Building Division for formal plan review and permitting as conditions of approval:

1.                     Submit/upload the (BCEPMGD) Broward County Environmental Protection and Growth Management Division Surface Water Management permit or exemption for any proposed paving and drainage shown on the civil engineering drawings.

2.                     Submit/upload the (FDEP) Florida Department of Environmental Protection (NOI) Notice of Intent for the proposed stormwater discharge from the proposed site construction activities.

3.                     The City Planning and Zoning Division and Utilities Division must approve these plans before the Citys Engineering Division can.

4.                     Submit/upload the (FDEP) Florida Department of Environmental Protection NPDES General Permit for the proposed stormwater discharge from the proposed site construction activities

5.                     Submit/upload a copy of the (FDOT) Florida Department of Transportation driveway connection permit or exemption for the proposed driveway, roadway curb, gutter, and sidewalk to be constructed within the road right-of-way of S. Fed.

6.                     Submit/upload a copy of the (FDOT) Florida Department of Transportation driveway drainage connection permit or exemption for the proposed driveway, roadway curb gutter, and sidewalk to be constructed within the road right-of-way of S. Fed.

7.                     Submit/upload a copy of the (FDOT) Florida Department of Transportation utility construction permit or exemption for the proposed off-site potable water, reclaimed water, and sewer main or lines to be constructed within the road right-of-way of S. Fed.

8.                     All water meters are to be set just inside the property line per the COPB Eng. standard details.

a.                     Proposed meter locations must be approved by the utilities.

9.                     The proposed irrigation line needs to be its own individual tap coming off the 6" watermain and we do not allow 2" corp stops.

a.                     Proposed meter locations must be approved by the utilities.

10.                     Both DDCV need to show a fire-only meter per city engineering detail 106-3 and both need to be set just inside the property line.

a.                     Proposed meter locations must be approved by the utilities.

11.                     The proposed outfall will require EPD regulatory approvals.

12.                     The sewer manholes are no longer there, but now we have a sewer force main. The foremain needs to be noted as private up to the plug valve.

13.                     Show on plan sheet 035 C-400 a 4" plug valve after the 4" tapping valve. Not a check valve. Also, show the 4" force main as private after the plug valve.

14.                     I uploaded the city engineering standard details 118-1, 118-2, 118-3 for your use. Place a note on plan sheet 035 C-400 for the proposed 8-inch water main that it will need to be restrained to the north and south.

 

 

 

UTILITIES

Nathaniel Watson | Nathaniel.Watson@copbfl.com

Pending Development Order

 

1.                     Additional comments may be forthcoming contingent upon future submittals to the PAM and/or DRC review process.

2.                     Please procure an approved Broward County EPD Surface Water Management permit or exemption for the proposed site and off-site work. Required during the official Bldg. E-plan submittal.

3.                     Please follow best management practices for sedimentation and erosion control of on-site and off-site storm systems.

4.                     Please note that domestic and fire water meters 3 and larger are not stock items. These items are subject to an order lead time. Please order in relation to the construction schedule to ensure a timely installation, as the order lead time can be 4 months or longer. Large meter installations are above-ground installations and shall not be placed in a vault.

5.                     Please note that, contingent upon the utility civil plan design, regulatory permits may be required.

6.                     Please note that the water and wastewater design proposed on Civil plan 035 C-400 Water & Sewer will be subject to the results of a required capacity study and the City's acceptance of those results.

 

 

BSO

Anthony Russo | Anthony_Russo@sheriff.org

Pending Development Order

 

Reviewer: BSO Deputy T. Russo for the City of Pompano Beach

anthony_russo@sheriff.org

M-(561) 917-4556 (Send Text & Email, No Voicemail)

Tuesday -Friday; 8 AM - 3 PM

 

See previous staff reports for the full set of previously made comments.

***IMPORTANT PLEASE READ***
Please submit a second CPTED & Security Strengthening Drawing Diagram that incorporates all of the same verbiage that is stated on the existing CPTED Narrative Document when applying for a permit. The purpose is to ensure that contractors & project managers working at the site have all the required information. This will help to expedite the CPTED inspection process. Ensure to stamp all CPTED documents "CONFIDENTIAL" in red.

 

A.**CONFIDENTAILITY STATEMENT**
PLEASE STAMP YOUR CPTED NARRATIVE & DIAGRAM "CONFIDENTIAL"
Information contained in CPTED & Security Strengthening Narrative Documents & Diagram Drawings are considered Confidential Pursuant to Florida State Statutes 119.071 (3); 119.15 (6b1); 281.301 & 286.011. Dissemination of security plans should be limited to authorized personnel only. All CPTED & Security Strengthening Plans submitted to the City of Pompano Beach must be stamped CONFIDENTIAL to ensure restricted access.

 

***Important Please Read***
The CPTED Narrative & the CPTED Drawing Diagram should be synonymous. Please incorporate all the above stated CPTED & Security Strengthening measures onto your existing CPTED Drawing Diagram & CPTED Narrative Document when re-submitting into the Pompano E-Plan.

 

***Note***
For DRC Comment Responses Letters, Please Issue Responses in the Affirmative such as Will Comply or Will Be Done. Comment Responses such as Acknowledged, Understood or Noted are ambiguous & do not clarify compliance.

Additionally, the author of your CPTED & Security Strengthening Plan should provide their name & contact information on the CPTED Narrative Document. This would help to expedite any necessary communication for the approval process.

***Important Please Read***
The CPTED Narrative & the CPTED Drawing Diagram should be synonymous. Please incorporate all the above stated CPTED & Security Strengthening measures onto your existing CPTED Drawing Diagram & CPTED Narrative Document when re-submitting into the Pompano E-Plan.

 

 

 

 

BUILDING DIVISION

Todd Stricker | todd.stricker@copbfl.com

Pending Development Order

 

Advisory Comments

 

1.FBC_BCA 107.1 As per the building official, separate building applications will be required for erosion control, site work, temporary fences, monumental signage and miscellaneous site structures.

2.FBC [F] 903.2 The enforcing agency will require that all provisions for an approved automatic sprinkler systems in new buildings and structures be provided in the locations described in sections 903.2.1 through 903.2.12 if applicable.

3.FBC 701.1 The enforcing agency will require that the provisions of this chapter, governing the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated construction separation of adjacent spaces to safeguard against the spread of fire and smoke within a building and the spread of fire to or from buildings, comply with this section of the code.

4.FBC 703.2 Fire-resistance ratings. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire-resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating.

5.FBC 1003.1 The enforcing agency will require that all general requirements specified in sections 1003 through 1013, applicable to all three elements of the means of egress system, in addition to those specific requirements for the exit access, the exit and the exit discharge, comply with this section of the code.

6.FBC 1029.1 In addition to the means of egress required by this chapter, provisions shall be made for emergency escape and rescue openings in Group R-2 Occupancies in accordance with Tables 1021.2(1) and 1021.2(2) and Group R-3 Occupancies. Basements and sleeping rooms below the fourth story above grade plane shall have at least one exterior emergency escape and rescue opening in accordance with this section.

7.FBC_BCA 107.1.1 The enforcing agency will require a life safety plan illustrating the floor area with proposed alterations with each room labeled. indicate construction type, fire rated walls, occupancy type: (current and proposed), occupancy load, means of egress, common path/travel distance/dead end corridor limits, accessibility accommodations including areas of refuge if applicable, emergency lighting, exits/exit signage, fire extinguishers, smoke alarms, fire suppression system and pull stations if applicable. Also provide tested design from accepted agency for rated walls and penetration details.

8.FBC_BCA 107.3.5.6 The enforcing agency will require product approvals be reviewed and approved by the building designer prior to submittal to verify that such products comply with the design specifications. Reviewed and approved product approvals shall then become part of the plans and/or specifications. Product approval shall be filed with the building official for review and approval prior to installation.

9.FBC_BCA 107.3.5.2 The enforcing agency will require that all shop drawings, (i.e. components attached to building structure, trusses/joists, window walls, railings, awnings, chutesetc), necessary to show compliance with applicable codes; shall be approved by the architect or professional engineer and submitted to the building official prior to installation.

10.F.S. 481.221(2) The enforcing agency will require digital signature panel to be active on all documents submitted for review to authenticate the serial number matches the submitted ESA. F.A.C. 61g1-16.005 Each sheet is required to be digitally or electronically signed, and bear the impress seal of, an architect or engineer (FBC_BCA 107.3.4.0.1).

11.FBC_BCA 107.3.4.0.8 All plans and/or specifications prepared by an architect or an engineer pursuant to the requirements of this code shall be hand signed, dated and sealed.

12.FBC_BCA 110.10.1 The enforcing agency will require a special inspector for various components of the building as determined by the building official. Building dept. will require special inspector form be completed and submitted for approval.

13.FBC_BCA 110.7 For threshold buildings, shoring and associated formwork or false work shall be designed and inspected by an engineer, employed by the permit holder or subcontractor, prior to any required mandatory inspections by the threshold building inspector.

14.FBC_BCA 110.8.1 The enforcing agency shall require a special inspector to perform structural inspections on a threshold building pursuant to a structural inspection plan prepared by the engineer or architect of record. The structural inspection plan must be submitted to the enforcing agency prior to the issuance of a building permit for the construction of a threshold building.

15.FBC 1512.3.1 The enforcing agency will require that all new roofing construction, including recovering and reroofing, repair or maintenance shall have A HVHZ uniform roofing permit application, as established by the authority having jurisdiction, completed and executed by a licensed contractor.
Fbc 1512.3.2 The uniform roofing permit shall include calculations in accordance With Chapter 16 (High-Velocity Hurricane Zones) of this code, unless the roofing assembly is less than the height/pressure threshold allowed in the applicable protocols herein.

16.FBC A208.2 Minimum number. Parking spaces complying with 502 shall be provided in accordance with table 208.2 except as required by 208.2.1, 208.2.2, and 208.2.3. Where more than one parking facility is provided on a site, the number of accessible spaces provided on the site shall be calculated according to the number of spaces required for each parking facility.

17.FBC A208.2.3.3 Parking for guests, employees, and other non-residents. Where parking spaces are provided for persons other than residents, parking shall be provided in accordance with table 208.2.

18.FBC A502.6 The enforcing agency will require parking space identification comply with the following code: signs shall include the international symbol of accessibility complying with FBC A703.7.2.1. Signs identifying van parking spaces when required By FBC A502.2 shall contain the designation Van Accessible. Reference Engineering Standard 300-5.

19.If Applicable, FBC R802.1.7.1 [IRC R802.10.1] Truss design drawings, prepared in conformance with section R802.1.7.1, shall be provided to the building official and approved prior to installation.

20.FBC 3303.5 Water Accumulation. The enforcing agency will require provisions be made to prevent the accumulation of water or damage to any foundations on the premises or the adjoining property.

21.1804.4 Site Grading. The ground immediately adjacent to the foundation shall be sloped away from the building at a slope of not less than one unit vertical in 20 units horizontal (5-percent slope) for a minimum distance of 10 feet measured perpendicular to the face of the wall. If physical obstructions or lot lines prohibit 10 feet of horizontal distance, a 5-percent slope shall be provided to an approved alternative method of diverting water away from the foundation. Swales used for this purpose shall be sloped a minimum of 2 percent where located within 10 feet of the building foundation. Impervious surfaces within 10 feet of the building foundation shall be sloped a minimum of 2 percent away from the building.

22.FBC_BCA 110.13.2.1 It shall be the joint responsibility of any owner of real property upon which construction is occurring, and any contractor responsible for said construction, to ensure that all road rights-of-way remain free at all times of all construction waste and trash resulting from such construction, and that all waste and trash resulting from the construction are contained on the real property upon which the construction occurs.

23.FBC_BCA 109.3 Building Permit Valuations. The applicant for a permit shall provide an estimated permit value at a time of application. Permit valuations, shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems.

24.FBC_BCA 110.8.5.4 All plans for the building which are required to be signed and sealed by the architect or engineer of record contain a statement that, to the best of the architects or engineers knowledge, the plans and specifications comply with the applicable minimum building codes and the applicable fire-safety standards as determined by the local authority in accordance with this section and chapter 633, Florida Statutes.

 

A preliminary examination of the documents has been performed; additional comments may apply when completed plans and/or specifications have been submitted for permitting to the building department.
Buildings shall comply with all local, state and federal codes in effect at time of application, including FEMA Floodplain, NPDES and HVHZ regulations.

FBC_BCA 105.2.3 Public service agencies/other approvals. The building official shall require that the laws, rules and regulations of any other regulatory AHJ, and where such laws, rules and regulations are applicable and are known to the building official, shall be satisfied before a permit shall be issued. The building official shall require such evidence, as in his or her opinion is reasonable, to show such other approvals.

City Ordinance 53.16(A)(1) Construction sites and construction activities. construction sites and operations shall be required to maintain during and after all construction, development excavation or alteration operations, structural and non-structural best management practices with the intent to reduce pollutants and sediment in stormwater runoff.

City Ordinance 152.06(A): If applicable, contractor shall provide temporary screened fence complying with City Ordinance 152.06(B) through 152.06(G).

FBC 3306.1 Pedestrians shall be protected during construction, remodeling and demolition activities as required by this Chapter and Table 3306.1. Signs shall be provided to direct pedestrian traffic.

City Ordinance 152.25(A) Site plans and construction documents, Information for development in areas with base flood elevations. The site plan or construction documents for any development subject to the requirements of the floodplain regulations shall be drawn to scale and shall include, as applicable to the proposed development all sections from: City Ordinance 152.25 (A)(1) thru City Ordinance 152.25 (A)(7). Delineation of flood hazard areas, floodway boundaries and flood zone(s), base flood elevation(s), and ground elevations if necessary for review of the proposed development, etc. residential buildings shall comply with City Ordinance 152.29(C)(1)(A) .

FHA Title VIII of the Civil Rights Act of 1968, commonly known as the Fair Housing Act, prohibits discrimination in the sale, rental, and financing of dwellings based on race, color, religion, sex, and national origin. In 1988, Congress passed the Fair Housing Amendments Act. The Amendments expand coverage of Title VIII to prohibit discriminatory housing practices based on disability and familial status. Now it is unlawful to deny the rental or sale of a dwelling unit to a person because that person has a disability.

FBC A201.1 This code establishes standards for accessibility to places of public accommodation and commercial facilities by individuals with disabilities. All new or altered public buildings and facilities, private buildings and facilities, places of public accommodation and commercial facilities subject to this code shall comply with 2017 FBC Accessibility.

FBC A221.1.1 Florida vertical accessibility. Nothing in this code relieves the owner of any building, structure, or facility governed by this code from the duty to provide vertical accessibility to all levels above and below the occupiable grade level, regardless of whether the ADA standards for accessible design require an elevator to be installed in such building, structure or facility.

FBC A206.2.1 Site arrival points. At least one accessible route shall be provided within the site from accessible parking spaces complying with FBC A502 and accessible passenger loading zones complying with FBC A209; public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve.

FBC_BCA 107.3.4.0.6 Compliance with the specific minimum requirements of this code shall not be in itself deemed sufficient to assure that a building or structure complies with all of the requirements of this code. it is the responsibility of the architect and/or engineer of record for the building, structure or facility to determine through rational analysis what design requirements are necessary to comply with 2017 FBC.