File #: 26-173    Version: 1 Name:
Type: Ordinance / Regular Agenda Status: Regular Agenda Ready
File created: 1/13/2026 In control: City Commission
On agenda: 4/14/2026 Final action:
Title: P.H. 2026-29: (PUBLIC HEARING 1ST READING) AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE CONTRACTS FOR CONSULTING/PROFESSIONAL SERVICES BETWEEN THE CITY OF POMPANO BEACH AND HAZEN AND SAWYER, P.C., MCCAFFERTY BRINSON CONSULTING, LLC, STANTEC CONSULTING SERVICES, INC., ARCADIS U.S., INC., AND CAROLLO ENGINEERS, INC., FOR PROFESSIONAL ENGINEERING SERVICES; PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE. (Fiscal Impact: N/A (on-demand via Work Authorizations)
Attachments: 1. City Manager Memo for CCNA.pdf, 2. City Attorney Memo.pdf, 3. 2026-119 - Ordinance.pdf, 4. RLI25-072 CCNA for water and Reuse Treatment Plant Projects.pdf, 5. Scoring Sheet.pdf, 6. No 13110-Arcadis U.S. Inc. - Continuing Svcs Contract ID # 13110 with Rate Sheets.pdf, 7. COI-Arcadis U.S. Inc. .pdf, 8. No. 13111-Carollo Engineers Inc - Continuing Contracts Svcs Contract ID #13111 with Rate Sheet (1).pdf, 9. COI-Carollo Engineers Inc. .pdf, 10. No. 13106-McCafferty Brinson Consulting, LLC - Continuing Svcs Contract I.pdf, 11. COI-McCafferty Brinson.pdf, 12. No.13112-.Hazen and Sawyer, P.C. - Continuing Svcs Contract .pdf, 13. Hazen and Sawyer COI .pdf, 14. No. 13113-Stantec Consulting Services Inc. - Continuing Svcs Contract.pdf, 15. Stantec COI.pdf, 16. Business Impact Estimate
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title

P.H. 2026-29: (PUBLIC HEARING 1ST READING)

AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE CONTRACTS FOR CONSULTING/PROFESSIONAL SERVICES BETWEEN THE CITY OF POMPANO BEACH AND HAZEN AND SAWYER, P.C., MCCAFFERTY BRINSON CONSULTING, LLC, STANTEC CONSULTING SERVICES, INC., ARCADIS U.S., INC., AND CAROLLO ENGINEERS, INC., FOR PROFESSIONAL ENGINEERING SERVICES; PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE.

(Fiscal Impact: N/A (on-demand via Work Authorizations)

 

staffcontact

(Staff Contact: Renuka Mohammed)

 

summary

Summary Explanation/Background:

The Utilities Department seeks City Commission approval to enter into continuing professional service agreements under RLI 25-072 - Water and Reuse Treatment Plant Projects, procured in accordance with the Consultants’ Competitive Negotiation Act (CCNA), Section 287.055, Florida Statutes, which requires a competitive, qualifications-based selection process for professional services. The solicitation was advertised on August 28, 2025, and closed on October 1, 2025, with six (6) Letters of Interest received and evaluated.
Based on the evaluation, the Committee ranked and recommended five firms for award: McCafferty Brinson Consulting, LLC; Carollo Engineers, Inc.; Arcadis US, Inc.; Hazen and Sawyer, P.C.; and Stantec Consulting Services, Inc. Tetra Tech was the lowest-ranked firm and was not selected based on the established evaluation criteria.
The agreements will be for a five-year term and will allow the City to issue project-specific Work Authorizations on an as-needed basis. Projects will be funded through approved operational and capital budgets. Approval supports the City’s goals for resilient, sustainable utility infrastructure.

 

Origin of request for this action: Utilities

Fiscal impact and source of funding: N/A, Several CIP and Operating Accounts

 

pagebreak1

 

 

 

 

 

 

 

strategicplan_emblem_field

RStrategic Plan Initiative

 

pagebr

 

 

 

 

 

 

strategicplan_description_field

Strategic Plan: Goal 4 (Item 6): Superior Capacity for Growth through Quality, Sustainable Development - Expand and enhance utility infrastructure - water, wastewater and stormwater.

Comprehensive Plan: Goal 6: Provide wastewater systems designed and maintained at the highest level to be durable, resilient, and sustainable to serve future generations to the maximum extent feasible and cost-effective.

Comprehensive Plan: Goal 7: Protect our fresh water supply and maintain water treatment and distribution systems designed and maintained at the highest level to be resilient, and sustainable to serve future generations to the maximum extent feasible and cost-effective.

Comprehensive Plan: Goal 8: Provide stormwater systems designed and maintained at the highest level to be resilient, and sustainable to serve future generations to the maximum extent feasible and cost-effective.