Legislation Details

File #: LN-877    Version: 1 Name:
Type: DRC Submission Status: Regular Agenda Ready
File created: 5/6/2026 In control: Development Review Committee
On agenda: 5/20/2026 Final action:
Title: MINOR DEVIATION TO SITE PLAN PZ20-12000013 BANK OF AMERICA
Attachments: 1. 000_DRCStaffReport_26-13200002.pdf, 2. DRC Documents_05.20.2026.zip, 3. DRC Drawings_05.20.2026.zip
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

boardname

DEVELOPMENT REVIEW COMMITTEE

Meeting Date: MAY 20, 2026

 

title

MINOR DEVIATION TO SITE PLAN PZ20-12000013 BANK OF AMERICA

 

projectinfo

Request:                     Minor Deviation

P&Z#                     26-13200002

Owner:                     G&C Platinum 2500 Investors LLC

Project Location:                     2335 E Atlantic Blvd

Folio Number:                     484236012200

Land Use Designation:                     ETOC (East Transit Oriented Corridor)

Zoning District:                     TO-EOD (Transit Oriented East Overlay District)

Commission District:                     1 (Audrey Fesik)

Agent:                      Ian Stanley

Project Planner:                     Pamela Stanton (pamela.stanton@copbfl.com / 954-786-5561)

 

otherinfo

 

 

Summary:                     

This Major Site Plan submittal is for a proposed Minor Deviation to an approved Site Plan (PZ#20-12000013) with an active Development Order. The modifications are limited to a portion of the plaza, to accommodate outdoor dining, with minimal affect on the terms of the original approval. The project includes modifications to the landscaping, ground surface treatments, seating arrangements, and includes a 1,920 square foot covered canopy. The project retains the public art that was a prominent part of the original approval.

 

 

 

 

Staff Conditions:                      

A consolidated list of staff review comments can be found on the attached staff report and in the ePlan online system. Comment responses can be made directly into ePlan, via a downloaded Excel sheet (accessed within ePlan), or on a document of your own creation. Resubmittal is required of BSO, Engineering, Fire, Landscape, and Zoning. The DRC Agenda will be released one week prior to the meeting. Please confirm your desire to attend once you have reviewed the comments provided.