File #: LN-604    Version: Name:
Type: DRC Submission Status: Regular Agenda Ready
File created: 5/1/2024 In control: Development Review Committee
On agenda: 10/1/2025 Final action:
Title: 580 BRINY
Attachments: 1. DRC Documents_05.15.2024.zip, 2. DRC Drawings_05.15.2024.zip, 3. DRC Drawings_08.21.2024.zip, 4. DRC Documents_08.21.2024.zip, 5. DRC Documents_10.02.2024.zip, 6. DRC Drawings_10.02.2024.zip, 7. AAC Documents 11-5-2024.zip, 8. AAC Drawings 11-5-2024.zip, 9. DRC Drawings_10.01.2025.zip, 10. DRC Documents_10.01.2025.zip

boardname

DEVELOPMENT REVIEW COMMITTEE

Meeting Date: OCTOBER 1, 2025

 

title

580 BRINY

 

projectinfo

Request:                     Major Site Plan and Building Design

P&Z#                     24-12000003

Owner:                     Claridge Homes Beachboys LP

Project Location:                     580 Briny AV

Folio Number:                     494306060260

Land Use Designation:                     MH- Medium-High 16-25 DU/AC

Zoning District:                     RM-20 (Multiple-Family Residence 20), AOD (Atlantic Overlay District)

Commission District:                     1 (Audrey Fesik)

Agent:                      Andrew Schein

Project Planner:                     Diego Guevara (diego.guevara@copbfl.com / 954-786-4310)

 

otherinfo

Summary:                     

The applicant is requesting approval of a Major Site Plan for the construction of a new ten-story Mixed-Use building.  The property is located at the northeast corner of Briny Avenue and SE 6th Street. It comprises 17 apartment units, a commercial area (665 sf.), 43 parking spaces (furnished with mechanical lifts, 1 ADA, and resident amenities. 

 

The property zone designation is Multiple Family Residential 20 (RM-20); it is also within the Atlantic Overlay District (AOD), which modifies some of the requirements and development standards of the residential zone designation. 

 

The table below is a summary of the DRC review of this Major Site Plan.

 

Development Review Committee Member Status 

Date:  10/1/2025

Planning

 

Zoning

Resubmittal Required

Urban Forestry and Landscaping

Resubmittal Required

Fire

Pending Development Order

Engineering

Pending Development Order

Utilities

Resubmittal Required

BSO

Resubmittal Required

Building

Pending Development Order

 

Staff Conditions:

 

See attached DRC Comment Report