A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING THE CITY’S FISCAL SUSTAINABILITY PLAN FOR THE GATEWAY DRIVE STORMWATER IMPROVEMENTS PROJECT, RELATING TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) STATE REVOLVING FUND (SRF); PROVIDING AN EFFECTIVE DATE.
(Fiscal Impact: N/A)
staffcontact
(Staff Contact: A. Randolph Brown)
summary
Summary Explanation/Background:
Based on the City’s Stormwater Master Plan (2013), Study Area 6 Gateway Drive- Industrial/Business Park area was identified as an area with minimal amount of drainage improvements. The area experiences widespread minor roadway flooding with the duration of the roadway flooding being the primary problem to be addressed. The City of Pompano Beach operates and maintains its own stormwater system within City ROW to provide flood control and water quality treatment within the area. The City has completed the construction portion of the Gateway Drive Stormwater Improvements. Per the Clean Water State Revolving Fund Loan Agreement SW062440, the City is required to provide a Fiscal Sustainability Plan that will need to be approved and accepted by the City in order to receive final disbursement of funds.
Origin of request for this action: Utilities
Fiscal impact and source of funding: N/A
pagebreak1
strategicplan_emblem_field
pagebr
strategicplan_description_field