title
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE WORK AUTHORIZATION NO. 1 IN THE AMOUNT OF $291,914.00 FOR THE INTERSECTION IMPROVEMENTS TO SIGNALIZE THE NE INTERSECTION OF MLK BLVD. AND NW 18 DRIVE, PURSUANT TO THE CONTRACT FOR PROFESSIONAL CONSULTING SERVICES BETWEEN THE CITY OF POMPANO BEACH AND CALVIN, GIORDANO & ASSOCIATES, INC. (CGA) FOR CIVIL ENGINEERING SERVICES; PROVIDING AN EFFECTIVE DATE.
(Fiscal Impact: $291,914)
staffcontact
(Staff Contact: Dr. Tammy Good)
summary
Summary Explanation/Background:
The Broward County Traffic Engineering Division (BCTED) performed a traffic signal warrant study in accordance with the guidelines identified in the Federal Highway Administration publication entitled Manual on Uniform Traffic Control Devices (MUTCD). The BCTED’s Technical Committee determined that signalization represents the best operational traffic control at the intersection of Dr MLK Boulevard and NW 18th Drive. This item is for professional traffic engineering design and regulatory permitting services for the intersection improvements to fully signalize the intersection of MLK Blvd and NW 18th Drive. Additionally, this scope consists of adding a north bound to east bound right turn lane and removal of the existing adjacent pedestrian signal per County’s assessment.
Origin of request for this action: Click here to enter origin of request text.
Fiscal impact and source of funding: $291,914.00 CIP#24-011 Account# 302-7742-530.65-03
pagebreak1
strategicplan_emblem_field
pagebr
strategicplan_description_field