File #: LN-554    Version: Name:
Type: PZB Submission Status: Regular Agenda Ready
File created: 12/19/2023 In control: Planning and Zoning Board
On agenda: 7/24/2024 Final action:
Title: GLC 22ND
Attachments: 1. DRC Documents_01.03.2024.zip, 2. DRC Drawings_01.03.2024.zip, 3. DRC Documents_02.21.2024.zip, 4. DRC Drawings_02.21.2024.zip, 5. DRC Documents_04.03.2024.zip, 6. DRC Drawings_04.03.2024.zip, 7. DRC Documents_05.01.2024.zip, 8. DRC Drawings_05.01.2024.zip, 9. PZB Documents 7-24-2024.zip, 10. PZB Drawings 7-24-2024.zip
boardname
PLANNING AND ZONING BOARD
Meeting Date: JULY 24, 2024

title
GLC 22ND

projectinfo
Request: Major Site Plan
P&Z# 23-12000046
Owner: GLC Pompano 1 LLC
Project Location: 31 NE 22 Avenue
Folio Number: 484236011830
Land Use Designation: ETOC (East Transit Oriented Corridor)
Zoning District: TO-EOD (Transit Oriented East Overlay District)
Commission District: 1 (Andrea McGee)
Agent: Thuy Turner (thuy@turnerplanningsolutions.com)
Project Planner: Pamela Stanton (pamela.stanton@copbfl.com / 954-786-5561)

otherinfo
Summary
The applicant is requesting Major Building Design approval for a 67-unit mixed-use development, which includes approximately 1,792 square feet of commercial use on the ground floor, parking and amenities on a 19,575 square foot lot (approximately 0.449 acres). The project is in the TO/EOD, within the Core Sub-Area on property located on the northwest corner of NE 22 Avenue, north of East Atlantic Boulevard. The proposed building height of 8 stories, or 80 feet is the maximum allowable height for a residential or mixed-use building in the Core Sub-Area.
The project proposes to apply four Density Bonus Options to increase the allowable density by 27 units, from 40 to 67 units (a maximum allowable 150 dwelling units per acre in any TO District). The proposed Density Bonus Options for the project are:
* Density Bonus Option #1: All new non-residential, multi-family residential and mixed-use construction that provide public art using one or a combination of the following strategies: 1) a fee equal to 1% of the project's construction costs or $250,000 whichever is less; or 2) a piece of artwork valued at 1% of the project's construction costs or a maximum of $250,000, whichever is less. The artwork shall be accessible to the public and may be displayed in public open spaces or areas along the street abutting the building. Public art shall be required to receive a recommendation by the Public Art Committee and approval from the City Commiss...

Click here for full text