Skip to main content

 

File #: LN-191    Version: Name:
Type: PZB Submission Status: Passed
File created: 10/11/2021 In control: Planning and Zoning Board
On agenda: 4/27/2022 Final action: 4/27/2022
Title: LIVE! SPA INDUSTRIAL SITE PLAN
Attachments: 1. PZB Documents_4.27.2022.zip, 2. PZB Drawings_4.27.2022.zip, 3. 000_PZB_StaffReport_21-12000035.pdf, 4. Matthew Mandell - Public Comment.pdf
boardname
PLANNING AND ZONING BOARD
Meeting Date: APRIL 27, 2022

title
LIVE! SPA INDUSTRIAL SITE PLAN

projectinfo
Request: Major Site Plan
P&Z# 21-12000035
Owner: Pompano Beach JV Land Holdings, Inc and PPI, Inc.
Project Location: 777 Isle of Capri Circle
Folio Number: Multiple Folios
Land Use Designation: RAC (Regional Activity Center)
Zoning District: PCD (Planned Commercial /Industrial District)
Commission District: 5 (Cyndy Floyd)
Agent: Amanda Martinez (561-405-3300)
Project Planner: Max Wemyss (954-786-7671 / max.wemyss@copbfl.com)

otherinfo
Summary:
The applicant is requesting Major Site Plan to construct approximately 658,000 square feet of industrial use consisting of a 517,000 square foot sortation facility and a 141,000 square foot delivery station building, with supporting accessory uses. The subject property is located on the east half of the Live! Resorts PCD south of Racetrack Road (SW 3 Street), north of the Cypress Bend Development, and west of the Tri-Rail train tracks. The site area (96.05 acres) is part of a 180.46-acre Planned Development. The total lot coverage of the site is 11.6%. The property has a Regional Activity Center (RAC) land use designation and a Zoning designation of Planned Commercial Development (PCD), which permits the industrial use. The site plan was most recently reviewed by the Development Review Committee on March 2, 2022 and by the Architectural Appearance Committee on April 5, 2022.
The property was rezoned to a Planned Commercial Development with an adopted master plan in 2020 (Ordinance 2021-02), following a Land Use Plan Amendment to entitle 1.5 million square feet of industrial use on the subject site. A traffic study was conducted at the time of rezoning for the proposed industrial use and found the proposed transportation improvements and traffic mitigation projects identified in Exhibit S of the PCD Plan to be sufficient for the total buildout of the PCD district. This project, as well as those previo...

Click here for full text