Title: FESTIVAL SOUTH
Attachments: 1. DRC Drawings_01.21.2026.zip, 2. DRC Documents_01.21.2026.zip
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

boardname

DEVELOPMENT REVIEW COMMITTEE

Meeting Date: JANUARY 21, 2026

 

title

FESTIVAL SOUTH

 

projectinfo

Request:                     Major Site Plan

P&Z#                     25-12000043

Owner:                     Ch Realty X-Fc I Miami Festival II LLC & Foundry Commercial LLC

Project Location:                     NW 33 ST

Folio Number:                     484221070070

Land Use Designation:                     I (Industrial)

Zoning District:                     I-1 (General Industrial)

Commission District:                     4 (Beverly Perkins)

Agent:                      Shane Zalonis

Project Planner:                     Pamela Stanton (954-786-5561 / pamela.stanton@copbfl.com)

 

otherinfo

Summary:                     

This Major Site Plan application is for the development of two industrial warehouse buildings of approximately 110,375 square feet (Building 1) and 71,755 square feet (Building 2) for a total of 182,130 square feet with associated truck courts and loading docks on a 10.4-acre property. The site includes an existing utility agency lease area at the west end of the property that will remain, and an existing pedestrian bridge at the north property line that extends over the existing retention pond on the adjacent property and connects to the next adjacent property to the north, aka the Festival Industrial Redevelopment (Foundry) site. The applicant has not determined whether the bridge will remain or be removed at the time of this Staff Report.

The table below is a summary of the DRC review of this Major Site Plan.

Development Review Committee Member

Status as of 1/8/2026

Planning

Pending Development Order

Zoning

Resubmittal Required

Landscape/Urban Forestry

Resubmittal Required

Fire Prevention

Resubmittal Required

Engineering

Resubmittal Required

Utilities

Comments not available

BSO

Pending Development Order

Building Division

Pending Development Order

 

Staff Conditions: See the attached DRC comment report.