Skip to main content

 

File #: LN-819    Version: Name:
Type: DRC Submission Status: Regular Agenda Ready
File created: 11/19/2025 In control: Development Review Committee
On agenda: 3/18/2026 Final action:
Title: POMPANO BEACH MARINE CENTER
Attachments: 1. DRC Drawings_12.03.2025.zip, 2. DRC Documents_12.03.2025.zip, 3. DRC Documents_03.18.2026.zip, 4. DRC Drawings_03.18.2026.zip
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Business
boardname
DEVELOPMENT REVIEW COMMITTEE
Meeting Date: MARCH 18, 2026

title
POMPANO BEACH MARINE CENTER

projectinfo
Request: Major Site Plan
P&Z# 24-12000020
Owner: Four Js Invest Group LLC & Pompano Bch Marine Center INC
Project Location: 701 South Federal Hwy
Folio Number: 494306020080
Land Use Designation: C (Commercial)
Zoning District: M-1 (Marine Business)
Commission District: 3 (Alison Fournier)
Agent: Matthew Sharpe
Project Planner: Diego Guevara (954-786-4310 / diego.guevara@copbfl.com)

otherinfo
Summary:
The applicant is requesting a Major Site Plan approval for the construction of a Marine Business project consisting of a two-story building with offices, showroom, repair facilities, 25 parking spaces, and landscaping, on 74,656 sf. (1.71 acres approximately) lot.


Staff Conditions:
PLANNING
Max Wemyss | max.wemyss@copbfl.com
Status:

1. Provide a copy of the Plat, obtain a new Plat, or provide a Plat Note Determination Letter (stating exemption for this Site Plan) obtained by the Broward County Planning Council.
2. Should Platting be required, obtain approval from FDOT for curb cuts, provide non-vehicular access lines. Reduce curb cuts or provide a one-way pair.
3. Property is Zoned M-1 and Land Use is Commercial. Both of which permit marina related activity.
4. No additional dedications are required for Federal hwy.
5. The City has sufficient water/wastewater treatment capacity to support the proposal (existing/improvement).


ZONING
Diego Guevara | diego.guevara@copbfl.com
Status: Pending Resubmit

Provide a written response to all comments.

1. The Circulation Plan illustrating the movement of different vehicles within the property shall illustrate all the required movements to perform the garbage pick-up, boat deliveries, emergency vehicles, including fire truck, operations, etc.
2. Provide a clear designated location for the staging area required for the garbage pick-up operation.
3. All parking and loading areas shall ...

Click here for full text