Skip to main content

 

File #: LN-682    Version: Name:
Type: DRC Submission Status: Regular Agenda Ready
File created: 1/22/2025 In control: Development Review Committee
On agenda: 5/7/2025 Final action:
Title: INDUSTRIAL REDEVELOPMENT - FLEA MARKET SITE
Attachments: 1. DRC Drawings_02.05.2025.zip, 2. DRC Documents_02.05.2025.zip, 3. DRC Drawings_03.19.2025.zip, 4. DRC Documents_03.19.2025.zip, 5. DRC Documents_05.07.2025.zip, 6. DRC Drawings_05.07.2025.zip

boardname

DEVELOPMENT REVIEW COMMITTEE

Meeting Date: MAY 7, 2025

 

title

INDUSTRIAL REDEVELOPMENT - FLEA MARKET SITE

 

projectinfo

Request:                     Major Site Plan

P&Z#                     24-12000024

Owner:                     Festival Real Estate LLC

Project Location:                     2900 W. Sample Rd.

Folio Number:                     484221070010

Land Use Designation:                     I (Industrial)

Zoning District:                     I-1 (General Industrial)

Commission District:                     4 (Beverly Perkins)

Agent:                      Shane Zalonis

Project Planner:                     Pamela Stanton (954-786-5561 / pamela.stanton@copbfl.com)

 

otherinfo

Summary:

The Industrial Redevelopment - Flea Market Site Major Site Plan application is for the development of industrial warehouses on the existing 25-acre Festival Marketplace (Festival Flea Market) site generally located at 2900 West Sample Road. The site plan proposes to demolish the existing building and construct three warehouse buildings that vary in size from approximately 115,000 square feet (Building 1), 60,200 square feet (Building 2), and 298,500 square feet (Building 3), with ancillary office space.

A land use plan amendment (PZ#22-92000001) was approved, changing the future land use designation of the majority of the property from Commercial to Industrial. The northeast corner of the property remains commercial and is approved for the construction of a gas station/convenience store. A rezoning application (PZ#22-13000002) was approved to change the Zoning District from General Business (B-3) to General Industrial (I-1) for the majority of the property.

The table below is a summary of the DRC review of this Major Site Plan. See attached report for DRC comments.

 

Development Review Committee Member

Status - 4/23/2025

Planning

Pending Development Order

Zoning

Resubmittal Required

Landscape and Urban Forestry

Resubmittal Required

Fire Prevention

Pending Development Order

Engineering

Pending Development Order

Utilities

Pending Development Order

BSO

Pending Development Order

Building Division

Pending Development Order