File #: LN-220    Version: Name:
Type: PZB Submission Status: Passed
File created: 1/5/2022 In control: Planning and Zoning Board
On agenda: 8/23/2023 Final action: 5/2/2023
Title: POMPANO CITI CENTRE RESIDENTIAL SITE PLAN
Attachments: 1. DRC Drawings_2-2-2022.zip, 2. DRC Documents_2-2-2002.zip, 3. DRC Documents 4-20-2022.zip, 4. DRC Drawings_4-20-2022.zip, 5. DRC Documents_6-15-22.zip, 6. DRC Drawings_6-15-22.zip, 7. DRC Drawings_10.19.22.zip, 8. DRC Documents_10.19.22.zip, 9. DRC Drawings_3.1.2023.zip, 10. DRC Documents_3.1.2023.zip, 11. AAC Documents_05-02-2023.zip, 12. AAC Drawings_05-02-2023 PART1.zip, 13. AAC Drawings_05-02-2023 PART2.zip, 14. AAC Drawings_05-02-2023 PART3.zip, 15. PZB Drawings_6-28-2023.zip, 16. PZB Documents_06-28-2023.zip, 17. Letter to Jean Dolan Re Citi Centre deferral.pdf, 18. 7.13.23 letter to Jean Dolan requesting deferral(54922278.1).pdf, 19. PZB Drawings_07-26-2023.zip, 20. PZB Documents_07-26-2023.zip, 21. PZB Drawings 8-23-2023.zip, 22. PZB Documents 8-23-2023.zip
boardname
PLANNING AND ZONING BOARD
Meeting Date: AUGUST 23, 2023

title
POMPANO CITI CENTRE RESIDENTIAL SITE PLAN

projectinfo
Request: Major Site Plan and Building Design
P&Z# 21-12000042
Owner: SVAP Pompano Citi Centre, LP.
Project Location: 1190-1200 E. Copans Rd
Folio Number: Multiple Folios
Land Use Designation: Commercial
Zoning District: B-3/PCD (General Business Planned Commercial Overlay)
Commission District: 2 (Rhonda Eaton)
Agent: Shane Zalonis (954-527-6258)
Project Planner: Pamela Stanton (954-786-5561 / pamela.stanton@copbfl.com)

otherinfo
Summary:
The applicant is requesting Major Site Plan approval in order to construct a new multi-family development with 356 dwelling units on a portion of the Pompano Citi Centre Shopping Mall site that will be carved out as a 12.1 acre (529,005 square foot) parcel with 26% lot coverage. The project consists of eight 4-story buildings with a clubhouse, amenities, landscaping and surface parking with detached garage buildings. A segment of the existing Citi Centre perimeter/loop road will be relocated around the exterior of the new development, inside of the Citi Centre and adjacent to the existing mall parking. Access to the new development will be via a driveway off the perimeter/loop road.

A traffic study was prepared in order to assess the proposed re-routing of the internal circulation roadway to accommodate the residential development. The development's main entrance was shifted eastward to a location that was deemed a safer vehicular ingress/egress point as a result of a review of the traffic study.

The site plan application is directly related to the agenda items to rezone the new parcel that is carved out of the Citi Centre site to RM-30, and to amend the Citi Centre PCD Master Plan to address the changes that result from the removal of the residential parcel from the Master Plan.

The property is located at approximately the south west portion of ...

Click here for full text