File #: 20-87    Version: 1 Name:
Type: Resolution / Consent Agenda Status: Passed
File created: 10/24/2019 In control: City Commission
On agenda: 11/12/2019 Final action: 11/12/2019
Title: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE WORK AUTHORIZATION NO. 3 IN THE NOT TO EXCEED AMOUNT OF $196,069.00, PURSUANT TO THE AGREEMENT FOR CONSULTING/PROFESSIONAL SERVICES BETWEEN THE CITY OF POMPANO BEACH AND CRAIG A. SMITH & ASSOCIATES, INC. TO PROVIDE ENGINEERING AND SURVEYING SERVICES FOR PROPOSED DRAINAGE IMPROVEMENTS IN THE U.S. 1 AND NE 14TH STREET CAUSEWAY AREA; PROVIDING AN EFFECTIVE DATE. (Fiscal Impact: $196,069.00)
Attachments: 1. 01_Memorandum 20-03 to City Attorney.pdf, 2. 02_Memorandum 2020-32 From City Attorney.pdf, 3. 03_Resolution_2020-39.pdf, 4. 04_Work Authorization #3_US 1 & NE 14 St_Signed by Consultant_10232019, 5. 05_Scope and Fee_rev02.pdf, 6. 06_Hourly Rate Schedule, 7. 07_Certificate of Insurance_COI, 8. 08_Memorandum 20-04 to Commission.pdf, 9. 09_Approved Ordinance No. 2016-20

 

title

A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE WORK AUTHORIZATION NO. 3 IN THE NOT TO EXCEED AMOUNT OF $196,069.00, PURSUANT TO THE AGREEMENT FOR CONSULTING/PROFESSIONAL SERVICES BETWEEN THE CITY OF POMPANO BEACH AND CRAIG A. SMITH & ASSOCIATES, INC. TO PROVIDE ENGINEERING AND SURVEYING SERVICES FOR PROPOSED DRAINAGE IMPROVEMENTS IN THE U.S. 1 AND NE 14TH STREET CAUSEWAY AREA; PROVIDING AN EFFECTIVE DATE.

(Fiscal Impact: $196,069.00)

 

staffcontact

(Staff Contact: Matthew Kudrna/Tammy Good)

 

summary

Summary Explanation/Background:

To provide professional engineering and surveying services for proposed drainage improvements in the US1 & NE 14th Street Causeway area referenced as Study Area #8 in the City's 2013 Stormwater Master Plan. The consultant will evaluate options for providing drainage improvements, identify flood prone areas, and address water quality treatment solutions within the project limits. The proposed alternatives will examine the feasibility of exfiltration trench, improved pipe conveyance and swale improvements. Services include the preparation of construction plans and specifications including surveying, utility locates services, utility test holes, geotechnical engineering services, engineering design, and permitting.

 

Origin of request for this action: Engineering

Fiscal impact and source of funding: 18-325 / 426-7603-538.65-03

 

pagebreak1

 

 

 

 

 

 

 

strategicplan_emblem_field

RStrategic Plan Initiative

 

pagebr

 

 

 

 

 

 

strategicplan_description_field

1.6.3 Complete Projects Identified in Master Plan.