File #: LN-146    Version: 1 Name:
Type: DRC Submission Status: Reported to Council
File created: 6/17/2021 In control: Development Review Committee
On agenda: 7/7/2021 Final action: 7/7/2021
Title: ENCO LLC PLAT
Attachments: 1. DRC Documents_7_7_21.zip, 2. DRC Drawings_7_7_21.zip
boardname
DEVELOPMENT REVIEW COMMITTEE
Meeting Date: JULY 7, 2021

title
ENCO LLC PLAT

projectinfo
Request: Plat
P&Z# 21-14000017
Owner: ENCO LLC
Project Location: 101 NW 13th Ave
Folio Number: 484234000890
Land Use Designation: I (Industrial)
Zoning District: I-1 (General Industrial)
Commission District:|910|Agent: Gregory Mire (954-709-5995)
Project Planner: Maggie Barszewski (maggie.barszewski@copbfl.com/ 954-786-721)

otherinfo


Summary:
This is a Plat request for property located at 101 NW 13 Ave. The folio number is 484234000890. The property is zoned I-1 and has a land use designation of Industrial (I). The Plat will be entirely labeled as Tract "A" and it will join two existing parcels by constructing a 3-story self-storage building. There is no Public access to the site as submitted. Access is being proposed through an easement. The Plat restricts the property to 20,000 sq. ft. of Industrial use.

















Staff Conditions:
BUILDING DIVISION
Plan Reviewer: carpelo.jeoboam@copbfl.com
Status: Authorized
Comments: BLDG 6-10-21 NRN

ZONING
Plan Reviewer: jaeeun.kim@copbfl.com
Status: Authorized With Conditions
Comments:
1. All development must comply with the standards of the I-1 (General Industrial) Zoning District and any applicable Use-Specific standard.
2. The proposed development requires reviews and approvals of Major Site Plan and Major Building Design.
3. The building shall be designed in accordance with 155.5603. Industrial Design Standards.
4. The proposed development shall comply with the requirements defined in ?155.5102, Off-Street Parking and Loading, and ?155.5203, Landscaping.
5. Additional comments will be provided upon the review of the site plan.

UTILITIES
Plan Reviewer: nathaniel.watson@copbfl.com
Status: Authorized With Conditions
Comments:
6-14-2021
1. Please note that additional comments may be forth coming contingent upon future submittals to the PAM and/or DRC review process.
2. The City of Pompano Beach Utiliti...

Click here for full text