File #: LN-142    Version: Name:
Type: DRC Submission Status: Passed
File created: 6/14/2021 In control: Development Review Committee
On agenda: 7/7/2021 Final action: 11/21/2023
Title: 554 N. RIVERSIDE DR. SITE PLAN
Attachments: 1. DRC Documents 7-7-2021.zip, 2. DRC Drawings 7-7-2021.zip, 3. DRC Drawings_10.20.21.zip, 4. DRC Documents_10.20.21.zip
boardname
DEVELOPMENT REVIEW COMMITTEE
Meeting Date: OCTOBER 20, 2021

title
554 N. RIVERSIDE DR. SITE PLAN

projectinfo
Request: Minor Site Plan
P&Z# 21-12000019
Owner: Linda Samson
Project Location: 554 N. Riverside Drive
Folio Number: 484331110100
Land Use Designation: MH (Medium-High 16-25 DU/AC)
Zoning District: RM-20
Commission District:|910|Agent: Anthony Fichera (561-715-8609)
Project Planner: Lauren Gratzer (954-545-7792) / lauren.gratzer@copbfl.com)

otherinfo


Summary:
The applicant is requesting MINOR SITE PLAN approval for the construction of three two-story townhomes. This is a resubmittal from the July 7, 2021 DRC.





Staff Conditions:
PLANNING
Daniel Keester | daniel.keester@copbfl.com
Review Complete Pending Development Order

-The property was platted (Blue Water Beach, Lot 12) and recorded prior to 1953 (Plat Book 26 Pg 29) with no restrictions on the plat. Based on Broward County''s Administrative Rules Document Broward Next (4.3) regarding platting exemption, it does not appear that replatting would not be required for the proposed multi-family development; however, staff recommends that the applicant submit a platting determination letter to the Broward County Planning Council confirming whether a plat note amendment or re-platting is required for the proposed development.

-It must be noted that the 2019 Draft FEMA FIRM update shows this property in an AE 6 (NAVD) flood zone which will require the FFE to be built at a minimum of 7 feet NAVD. The Paving, Grading and Drainage Plan is showing the FFE at only 6.5'' NAVD. If the 2019 FEMA maps are adopted prior to the issuance of building permit, the FFE will have to be increased to 7'' NAVD to be permitted.


ENGINEERING DEPARTMENT
David McGirr | david.mcgirr@copbfl.com
Review Complete Pending Development Order

The following comments must be addressed prior to the submission of these plans to the Building Division for formal plan review and permitting:

1. Place note on landsc...

Click here for full text