File #: 22-498    Version: Name:
Type: Ordinance / Regular Agenda Status: Passed
File created: 7/8/2022 In control: City Commission
On agenda: 9/13/2022 Final action: 9/13/2022
Title: P.H. 2022-75: (PUBLIC HEARING 2ND READING) AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT BETWEEN THE CITY OF POMPANO BEACH AND MARLIN ENGINEERING, INC. FOR CONSULTANT SERVICES FOR COUNTY SURTAX FUNDED TRANSPORTATION STREETSCAPE IMPROVEMENTS ALONG RIVERSIDE DRIVE FROM ATLANTIC BOULEVARD TO NE 14th STREET; PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE. (Fiscal Impact: $699,762.10) FIRST READING: JULY 26, 2022
Attachments: 1. Memo to Commission.pdf, 2. Ordinance.pdf, 3. City Attorney Memo.pdf, 4. Agreement.pdf, 5. Agreement Signature Page.pdf, 6. Exhibit A Scope of Services Revised.pdf, 7. Back-up 1 to Exhibit B Maximum Billing Rates.pdf, 8. Back-up 2 to Exhibit B Maximum Billing.pdf, 9. Exhibit C - Insurance.pdf, 10. Marlin Engineering, Inc. 8.31.21-2.pdf, 11. Exhibit D - Work Authorization Form.pdf, 12. Exhibit E - CBE Subconsultant Schedule and Letters of IntentFirm revised (1).pdf, 13. Riverside Conceptual Plans.pdf, 14. Riverside Drive Project Schedule.pdf, 15. ILA.pdf, 16. Location Map.pdf
title
P.H. 2022-75: (PUBLIC HEARING 2ND READING)
AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE AN AGREEMENT BETWEEN THE CITY OF POMPANO BEACH AND MARLIN ENGINEERING, INC. FOR CONSULTANT SERVICES FOR COUNTY SURTAX FUNDED TRANSPORTATION STREETSCAPE IMPROVEMENTS ALONG RIVERSIDE DRIVE FROM ATLANTIC BOULEVARD TO NE 14th STREET; PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE.
(Fiscal Impact: $699,762.10)

FIRST READING: JULY 26, 2022

staffcontact
(Staff Contact: Fernand Thony/Horacio Danovich)

summary
Summary Explanation/Background:
Staff is seeking City Commission approval of an Ordinance to execute a contract with Marlin Engineering (ME) in the sum of $699,762.10. The firm was selected to assist the City with design services to improve Riverside Drive from Atlantic Boulevard to NE 14th Street (see Location Map). ME will work on roadway realignment to resolve encroachments onto the travel lanes from adjacent private driveways; design of drainage facilities to help reduce ponding conditions caused by severe storms and add facilities to offset impacts from future sea level rise; evaluate and assist with installation of FPL lighting equipment throughout the corridor to provide adequate coverage within the public right of way; identify opportunities to add sidewalks, particularly along the east side of the road; increase landscape and add irrigation equipment as needed, to name a few (see Exhibit A - Scope of Services). The roadway was previously evaluated by the Renaissance Group during the corridor studies conducted in 2013. Improvements to this corridor were prioritized and the City submitted a request to Broward County for consideration to fund the project with Penny for Transportation (Surtax) funds. The project was subsequently approved and certified via an Interlocal Agreement (ILA - see attached), which was executed by the City on March 22, 2022, and the Cou...

Click here for full text