File #: 22-473    Version: 1 Name:
Type: Approval Request / Regular Agenda Status: Passed
File created: 6/30/2022 In control: City Commission
On agenda: 9/13/2022 Final action: 9/13/2022
Title: Approval to award ITB E-22-22, N.E. 3rd Street & N.E. 4th Street Storm Drainage Improvements (State Revolving Fund), to the lowest responsive and responsible bidder, Southeastern Engineering Contractors, Inc., at a cost of $940,846.60. (Fiscal Impact: $940,846.60)
Attachments: 1. Purchasing Memo 22-022 Approve award of E-22-22, N.E. 3rd Street & N.E. 4th Street Storm Drainage Improvements .pdf, 2. Engineering Memo 22-34.pdf, 3. E-22-22 Bid Award Recommendation.pdf, 4. E-22-22 Bid Tabulation.pdf, 5. E-22-22 NE 3rd NE 4th Storm Drainage Improvements (SRF).pdf

title

Approval to award ITB E-22-22, N.E. 3rd Street & N.E. 4th Street Storm Drainage Improvements (State Revolving Fund), to the lowest responsive and responsible bidder, Southeastern Engineering Contractors, Inc., at a cost of $940,846.60.

(Fiscal Impact: $940,846.60)

 

staffcontact

(Staff Contact: A. Randolph Brown/Tammy Good)

 

summary

Summary Explanation/Background:

Invitation to Bid (ITB) E-22-22 was issued to obtain bids to establish a contract for new storm drainage water piping and drainage structures by installing a new complete stormwater collection system, reconstruction of the project roadways, swales, signage, and thermoplastic pavement markings located on NE 3rd and NE 4th Streets east of Harbor Drive in Pompano Beach, Florida. This work is required to improve surface water runoff collection and provide safe passage for pedestrian and vehicular traffic throughout the area Improved surface water runoff collection will provide safe passage for pedestrian and vehicular traffic. Bid award is recommended to the lowest responsive and responsible bidder, Southern Engineering Contractors Inc., at a cost of $940,846.60.  The General Services Department performed outreach to local storm drainage companies to inform them about this project.  A total of twenty-five (25) local companies were notified.  City Commission approval of this contract award is requested.

 

Origin of request for this action: Staff

Fiscal impact and source of funding: $940.846.60. from budgeted funds in account 426-7604-538.65-03 Capital Projects Fund/ Project 18-326 Stormwater NE 4 St NE 3.

 