File #: 17-178    Version: 1 Name:
Type: Resolution / Regular Agenda Status: Passed
File created: 1/5/2017 In control: City Commission
On agenda: 2/14/2017 Final action: 2/14/2017
Title: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE A PUBLIC TRANSPORTATION JOINT PARTICIPATION AGREEMENT BETWEEN THE CITY OF POMPANO BEACH AND THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FOR CONSTRUCTION OF TAXIWAY "DELTA" RELOCATION AND CONSTRUCTION OF TAXIWAY "SIERRA" AND "TANGO" CONNECTORS AT THE POMPANO BEACH AIR PARK; PROVIDING AN EFFECTIVE DATE. (Fiscal Impact: $4,166,575 (80% FDOT Grant, 20% Airpark Enterprise Fund)
Attachments: 1. signed memo.pdf, 2. 2017-64.pdf, 3. PMP 433476 JPA - with city signature.pdf, 4. PMP 433476 ExA.pdf, 5. PMP 433476 ExB.pdf, 6. PMP 433476 ExC.pdf, 7. PMP 433476 ExD.pdf, 8. BA CITY TRANS -ITEM 17-178.pdf
title
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF POMPANO BEACH, FLORIDA, APPROVING AND AUTHORIZING THE PROPER CITY OFFICIALS TO EXECUTE A PUBLIC TRANSPORTATION JOINT PARTICIPATION AGREEMENT BETWEEN THE CITY OF POMPANO BEACH AND THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FOR CONSTRUCTION OF TAXIWAY "DELTA" RELOCATION AND CONSTRUCTION OF TAXIWAY "SIERRA" AND "TANGO" CONNECTORS AT THE POMPANO BEACH AIR PARK; PROVIDING AN EFFECTIVE DATE.
(Fiscal Impact: $4,166,575 (80% FDOT Grant, 20% Airpark Enterprise Fund)

staffcontact
(Staff Contact: Steven Rocco/Robert McCaughan)

summary
Summary Explanation/Background:
The construction of Taxiway "Delta" relocation and construction of Taxiway "Sierra" & "Tango" taxiway connectors at Pompano Beach Airpark are included in an existing Airport Capital Project 14-247. The FAA/FDOT recommended that this project be divided into two phases design, which is now complete, and construction. This project was approved by the City Commission as part of the Pompano Beach Air Park Master Plan Update that was adopted on July 22, 2008 by Resolution No. 2008-259 as well as the City of Pompano Beach Capital Improvement Plan adopted on October 10, 2016 by Resolution 2017-20.

Taxiway Delta provides access to/from Runway 15/33 and is currently located 400 ft. from the centerline of the runway. The relocation of the taxiway is necessary to be in compliance with FAA design and safety standards for Category B Group II aircraft. Shifting the taxiway to a distance of 240 feet from the centerline of the runway will improve efficiency of airfield operations.

The project scope includes the construction and relocation of the full length of taxiway Delta parallel to Runway 15-33 and the associated taxiway connectors, "Sierra" and "Tango".



Origin of request for this action: Steven Rocco
Fiscal impact and source of funding: The total estimated cost of the Project is $4,166,575. This amount is based upon the estimate summarized i...